109.3.1 Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94, the concrete need not be on the job.
Related products
-
TR-1 SPECIAL INSPECTIONS
TR-1 Raising and Moving of a Building (BC 1704.20.5)
TR-1 Building Raising and Moving Inspection Raising and moving a building is one of the most […]
-
TR-1 SPECIAL INSPECTIONS
TR-1 Structural Steel – Welding BC 1704.3.1
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED STANDARDa BC REFERENCE 1. Material verification of high-strength bolts, nuts and washers: a. Identification markings to…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Open-Web Steel Joists and Joist Girders
-
TR-1 SPECIAL INSPECTIONS
TR-1 Seismic Resistance of Access Floors