TR-1 Special Inspections in NYC

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Adhesive-Based Solar Pedestal Bonding Systems

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.1.1 (2022); BB #2025-010

    Work type(s): SL

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Alternative Materials – OTCR Buildings Bulletin

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1704.14 (2014); BC 1705.1.1 (2022)

    Work type(s): PL, SP, SD, AN, SF, SG, GC, MS, BE, ST, FO, EA, SOE, PMM, SC, FN, SH, SF

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Aluminum Welding (BC 1704.26)

    1704.26 Aluminum construction. The special inspections for structural aluminum elements of buildings and structures shall be as required by Section 1704.26.1‡. 1704.26.1…

    Technical info

    1704.26 Aluminum construction. The special inspections for structural aluminum elements of buildings and structures shall be as required by Section 1704.26.1‡.

    1704.26.1 Welding operations. All welding operations of aluminum elements shall be subject to special inspection for compliance with this code, AA ASM-35, Parts 1A and 1B of the Aluminum Design Manual, and AWS D1.2.

    Exception: Welding operations in connections where the calculated stresses in the welds are less than 50 percent of the basic allowable values.

    Details

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Chimneys (BC 1704.24)

    1704.24 Chimneys. New and altered chimneys shall be subject to special inspection. The chimney shall be inspected to verify compliance with the…

    Technical info

    1704.24 Chimneys. New and altered chimneys shall be subject to special inspection. The chimney shall be inspected to verify compliance with the approved construction documents, and proper clearance or isolation from adjacent combustible construction. Testing of the chimney shall be performed in accordance with Section 810 of the New York City Mechanical Code.

    Exception: A pressurized smoke test need not be performed on an existing negative pressure chimney if the lining of such chimney is not affected by alterations and the registered design professional specifies on the approved construction documents that such test does not need to be performed on such chimney.

    Details

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Combustible Exterior Wall Coverings

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.16 (2022)

    Work type(s): GC, FO

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Concrete – Cast -in -Place (BC 1704.4)

    1704.4 Concrete construction. The special inspections and verifications for concrete construction shall be as required by this section and Table 1704.4. Exception:…

    Technical info

    1704.4 Concrete construction. The special inspections and verifications for concrete construction shall be as required by this section and Table 1704.4.

    Exception: Special inspections shall not be required for the following when specifically exempted on the approved construction documents:

    1. Concrete placement of less than 50 cubic yards (38 m3)‡ provided that the concrete is nonstructural and is not subject to the durability requirements of Section 1904. In such case, testing may be waived by the registered design professional who prepared the structural construction documents.
    2. Nonstructural concrete slabs supported directly on the ground, including prestressed slabs on grade, where the effective prestress in the concrete is less than 150 psi (1.03 Mpa).
    3. Concrete foundation(s) for lightweight fences and recreational equipment.
    4. Concrete patios, site furnishings, garden walls, driveways, sidewalks and similar construction.

    Details

    Full details ›
    Calculated total $1,200.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Concrete – Precast (BC 1704.4)

    1704.4 Concrete construction. The special inspections and verifications for concrete construction shall be as required by this section and Table 1704.4. Exception:…

    Technical info

    1704.4 Concrete construction. The special inspections and verifications for concrete construction shall be as required by this section and Table 1704.4.

    Exception: Special inspections shall not be required for the following when specifically exempted on the approved construction documents:

    1. Concrete placement of less than 50 cubic yards (38 m3)‡ provided that the concrete is nonstructural and is not subject to the durability requirements of Section 1904. In such case, testing may be waived by the registered design professional who prepared the structural construction documents.
    2. Nonstructural concrete slabs supported directly on the ground, including prestressed slabs on grade, where the effective prestress in the concrete is less than 150 psi (1.03 Mpa).
    3. Concrete foundation(s) for lightweight fences and recreational equipment.
    4. Concrete patios, site furnishings, garden walls, driveways, sidewalks and similar construction.

    Details

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Concrete – Prestressed (BC 1704.4)

    1704.4 Concrete construction. The special inspections and verifications for concrete construction shall be as required by this section and Table 1704.4. Exception:…

    Technical info

    1704.4 Concrete construction. The special inspections and verifications for concrete construction shall be as required by this section and Table 1704.4.

    Exception: Special inspections shall not be required for the following when specifically exempted on the approved construction documents:

    1. Concrete placement of less than 50 cubic yards (38 m3)‡ provided that the concrete is nonstructural and is not subject to the durability requirements of Section 1904. In such case, testing may be waived by the registered design professional who prepared the structural construction documents.
    2. Nonstructural concrete slabs supported directly on the ground, including prestressed slabs on grade, where the effective prestress in the concrete is less than 150 psi (1.03 Mpa).
    3. Concrete foundation(s) for lightweight fences and recreational equipment.
    4. Concrete patios, site furnishings, garden walls, driveways, sidewalks and similar construction.

    Details

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Construction Operations Influencing Adjacent Structures

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $3,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Construction Utilizing CLT or SCL Type IV

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 CPVC for water recycling distribution piping systems

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.1.1 (2022); BB #2011-021

    Work type(s): PL, SC

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Designated Seismic System

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Emergency Power Systems (Generators)

    1704.13 Special case. Special inspections shall be required for proposed work that is, in the opinion of the commissioner, unusual in its…

    Technical info

    1704.13 Special case. Special inspections shall be required for proposed work that is, in the opinion of the commissioner, unusual in its nature, such as, but not limited to, the following examples:
    •Construction materials and systems that are alternatives to materials and systems prescribed by this code.
    •Unusual design applications of materials described in this code.
    •Materials and systems required to be installed in accordance with additional manufacturer’s instructions that prescribe requirements not contained in this code or in standards referenced by this code.

    SECTION BC 2702 EMERGENCY POWER SYSTEMS
    2702.1 Installation. Emergency systems shall be installed in accordance with the New York City Electrical Code, NFPA 110 and NFPA 111, and shall have an on-premises fuel supply sufficient for not less than 6-hour full-demand operation of the system. However, for R-2 occupancies required to provide emergency power systems pursuant to the provisions of Section 403.11.2, and for voluntarily installed emergency power systems, natural gas from the public utility street main shall be permitted as fuel supply.

    Details

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Energy Code Compliance Inspections (BC 110.3.5)

    110.3.5  Energy  code  compliance  inspections.Inspections  shall  be  made  to  determine  compliance  with  approved  construction documents. per TR-8

    Technical info

    110.3.5  Energy  code  compliance  inspections.Inspections  shall  be  made  to  determine  compliance  with  approved  construction documents.

    Details

    per TR-8

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Excavation – Sheeting Shoring Bracing

    3304.4 Protection of sides of excavations. 3304.4.1 Shoring, bracing and sheeting. The sides of all excavations, including related or resulting embankments, that…

    Technical info

    3304.4 Protection of sides of excavations.

    3304.4.1 Shoring, bracing and sheeting. The sides of all excavations, including related or resulting embankments, that are 5 feet (1524 mm) or greater in depth or height measured from the level of the adjacent ground surface to the deepest point of the excavation shall be protected and maintained by shoring, bracing, sheeting, sheet piling, or by other retaining structures as may be necessary to prevent the sides of the excavation from caving in before permanent supports are provided. Such methods of protection shall be subject to special inspection in accordance with the provisions of Chapter 17.

    Alternatively, excavation sides may be sloped not steeper than 45 degrees (0.79 rad)‡ or stepped so that the average slope is not steeper than 45 degrees (0.79 rad)‡ with no step more than 5 feet (1524 mm) high, provided such slope does not endanger any structure, including subsurface structures. Deviation from the foregoing limitations for cut slopes shall be permitted only upon the completion of a soil investigation report acceptable to the commissioner.

    Details

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Exhaust and Vent Systems in Plenums and Ducts

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Exterior Insulation Finish Systm (BC 1704.12)

    1704.12 Exterior insulation and finish systems (EIFS). Special inspections shall be required for all EIFS applications installed more than 15 feet (4572…

    Technical info

    1704.12 Exterior insulation and finish systems (EIFS). Special inspections shall be required for all EIFS applications installed more than 15 feet (4572 mm)‡ above adjacent finished grades.

    1704.12.1 The special inspection shall include verification of: compliance with approved construction documents for attachment to structure, installation of waterproofing membranes, weeps, drains, mold prevention features and conformance with the manufacturers’ installation guidelines.

    Details

    SIGN-ON / Inspect / SIGN-OFF (package

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Final Inspection 28-116.2.4.2 BC-109.5 Dir-14

    Call for job specific quote.   109.5 Final inspection. Refer to Chapter 1 of Title 28 of the Administrative Code.   Directive…

    Technical info

    Call for job specific quote.

     

    109.5 Final inspection. Refer to Chapter 1 of Title 28 of the Administrative Code.

     

    Directive 14 Final inspection is required on all non- CO jobs in NYC as per Bulletin 2018-08.

    Details

    Full details ›
    Calculated total $3,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Fire Resistance Rated Construction (BC 110.3.4)

    110.3.4   Fire-resistance-rated   construction   inspection.Fire-resistance-rated   construction   shall   be   inspected   to   determine compliance with the…

    Technical info

    110.3.4   Fire-resistance-rated   construction   inspection.Fire-resistance-rated   construction   shall   be   inspected   to   determine compliance with the approved construction documents, including inspection of the following work:1.Fire-resistance-rated partitions, floors, ceilings, shafts;and2.Fire shutters.Exception:Where  the  scope  of  work  affecting  an  existing  fire-rated  wall  assembly  is  limited  to  through-penetration firestopping  and,  in  the  course  of  work,  the  cutting  away  or  removal  of  any  part  of  the  existing  fire-resistance-rated construction becomes necessary in the general area surrounding the penetration, not to exceed 4 square feet (0.37 m2) in any given  area,  the  progress  inspection  for  fire-resistance-rated  construction  shall  not  be  required  provided  that  the  special inspection  agency  for  the  through-penetration  firestopping  special  inspection  verifies  that  the  removed  portion  of  fire-resistance-rated construction (i) is less than 4 square feet (0.37 m2), and (ii) has been restored to its original condition

    Details

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Fire-Resistant Penetrations and Joints BC1704.27

    109.3.4 Fire-resistance-rated construction inspection. Fire-resistance-rated construction shall be inspected to determine compliance with the approved construction documents, including inspection of the following…

    Technical info

    109.3.4 Fire-resistance-rated construction inspection. Fire-resistance-rated construction shall be inspected to determine compliance with the approved construction documents, including inspection of the following work:
    1. Fire-resistance-rated partitions, floors, ceilings, shafts;
    2. Fireblocking of concealed spaces;
    3. Through-penetration firestopping, draftstopping and fireblocking;
    4. Fire dampers;
    5. Fire shutters; and
    6. Protection of structural members.

    Exception: Work regulated and inspected under Chapter 17.

    Details

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Flood Zone Compliance (BC G105)

    109.3.2 lowest floor elevation. In areas of special flood hazzard, upon placement of the lowest floor, including the basement (for flood zone…

    Technical info

    109.3.2 lowest floor elevation. In areas of special flood hazzard, upon placement of the lowest floor, including the basement (for flood zone purposes), and prior to further vertical construction, the elevation report required in item 1 of Section G shall be submitted to the department.

    Details


    TR-1 Private Onsite Disposal System Inspection

    A private (PVT) onsite disposal system is a self-contained sewage treatment and absorption system installed on a property that is not connected — or not yet connected — to the NYC municipal sewer network. While most of New York City’s five boroughs are served by the DEP sewer system, private onsite disposal systems remain in active use on properties in Staten Island, eastern Queens, and areas of Brooklyn where sewer laterals have not been extended, and are also required for certain new construction projects on large or remote lots.

     

    System types covered under this inspection:

     

    • Septic tanks — underground chambers that collect and partially treat sewage before discharging to a soil absorption field
    • Cesspools — older pit-based systems that allow liquid waste to seep into the surrounding soil; subject to NYC DEP elimination programs in many areas
    • Soil absorption systems (leach fields) — subsurface distribution pipes or chambers that disperse pre-treated effluent into the ground

     

    When a TR-1 Progress Inspection Is Required

     

    A TR-1 PVT onsite disposal system inspection is required by the NYC Department of Buildings when an onsite disposal system is included as part of a new construction or alteration permit. The inspection must be performed before the system is covered or backfilled — once buried, verification of code compliance is no longer possible without excavation.

     

    What EZTR1 Inspects

     

    EZTR1’s certified TR-1 progress inspectors verify the following against the approved DOB construction drawings and NYC Plumbing Code (PC) requirements:

     

    • System location and setback distances — minimum clearances from property lines, foundations, wells, and drainage areas are confirmed on site
    • Tank and absorption field sizing — dimensions and capacity match the approved design based on calculated daily sewage flow
    • Depth of installation — cover depths comply with the approved drawings and code minimums
    • Inlet and outlet pipe connections — proper tee connections, baffle placement, and effluent distribution confirmed before backfill

     

    All inspection findings are documented in the TR-1 progress inspection report filed directly with the NYC Department of Buildings. Inspections are timed to occur at the construction milestone before the system is covered, to avoid costly re-excavation.

     

    Ready to schedule your TR-1 PVT onsite disposal system inspection? Contact EZTR1 to coordinate timing with your plumbing contractor before backfill.

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Footing Foundation (BC 109.3.1)

    109.3.1 Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing…

    Technical info

    109.3.1 Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94, the concrete need not be on the job.

    Details

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Fuel-Oil Storage and Fuel-Oil Piping Systems

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1704.17 (2014); BC 1705.22 (2022)

    Work type(s): PL, AN, BE*

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Heating Systems 1704.25

    1704.25 Through-penetration firestop systems, concealed draftstop and fireblock systems. All through-penetration firestopping, draftstopping and fireblocking shall be subject to periodic special inspection…

    Technical info

    1704.25 Through-penetration firestop systems, concealed draftstop and fireblock systems. All through-penetration firestopping, draftstopping and fireblocking shall be subject to periodic special inspection prior to concealment to determine compliance with the approved construction documents. Listed systems shall be inspected for compliance with their listing.

    Exception: Through-penetration firestop systems may be inspected in accordance with ASTM E 2174-04 when authorized by the registered design professional of record and when the contractor applies the procedures established in that standard.

    Details

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 High Temperature Hot Water Piping (Welding) (BC 1704-18)

    1704.17 High-pressure-steam piping. High-pressure-steam piping regulated by Section 1210 of the New York City Mechanical Code, shall be subject to special inspection…

    Technical info

    1704.17 High-pressure-steam piping. High-pressure-steam piping regulated by Section 1210 of the New York City Mechanical Code, shall be subject to special inspection in accordance with this section.

    1704.17.1 Welding. The special inspector shall verify the qualifications of the welder and the quality of the welding materials and equipment prior to welding operations. The special inspector shall review the proposed welding procedures for compliance with applicable standards listed in Section 1210.4 of the New York City Mechanical Code.1704.17.2 Welding operations. The special inspector shall perform periodic inspection of the pipe joining and welding operations in accordance with the above. Radiographic testing shall be applied to connections as indicated in Section 1210.4.9 of the New York City Mechanical Code. Unacceptable connections and installations shall be rejected.

    1704.17.2 Welding operations. The special inspector shall perform periodic inspection of the pipe joining and welding operations in accordance with the above. Radiographic testing shall be applied to connections as indicated in Section 1210.4.9 of the New York City Mechanical Code. Unacceptable connections and installations shall be rejected.

    1704.17.3 Testing of high-pressure-steam piping. Hydrostatic testing shall be performed on the completed installation of new and altered systems in accordance with Section 1210.4.10 of the New York City Mechanical Code.

    Exception: Testing requirements shall not apply to alteration or repairs to existing high-pressure-steam piping systems in which the integrity of the piping is not affected. Such alterations shall be visually inspected for compliance with the approved construction documents.

    Details

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 High-Pressure Fuel-Gas Piping (Welding) (BC 1704.19)

    1704.19 High-pressure-gas piping.High-pressure-gas pipingregulated in Section 406 of the New York City FuelGas Codeshall be subject to special inspection in accordance with…

    Technical info

    1704.19 High-pressure-gas piping.High-pressure-gas pipingregulated in Section 406 of the New York City FuelGas Codeshall be subject to special inspection in accordance with this section.Special inspection of seismic bracing shall be performed in accordance with Section 1707.7

    Details

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 High-Pressure Steam (Welding) (BC 1704-17)

    1704.17 High-pressure-steam piping. High-pressure-steam piping regulated by Section 1210 of the New York City Mechanical Code, shall be subject to special inspection…

    Technical info

    1704.17 High-pressure-steam piping. High-pressure-steam piping regulated by Section 1210 of the New York City Mechanical Code, shall be subject to special inspection in accordance with this section.

    1704.17.1 Welding. The special inspector shall verify the qualifications of the welder and the quality of the welding materials and equipment prior to welding operations. The special inspector shall review the proposed welding procedures for compliance with applicable standards listed in Section 1210.4 of the New York City Mechanical Code.1704.17.2 Welding operations. The special inspector shall perform periodic inspection of the pipe joining and welding operations in accordance with the above. Radiographic testing shall be applied to connections as indicated in Section 1210.4.9 of the New York City Mechanical Code. Unacceptable connections and installations shall be rejected.

    1704.17.2 Welding operations. The special inspector shall perform periodic inspection of the pipe joining and welding operations in accordance with the above. Radiographic testing shall be applied to connections as indicated in Section 1210.4.9 of the New York City Mechanical Code. Unacceptable connections and installations shall be rejected.

    1704.17.3 Testing of high-pressure-steam piping. Hydrostatic testing shall be performed on the completed installation of new and altered systems in accordance with Section 1210.4.10 of the New York City Mechanical Code.

    Exception: Testing requirements shall not apply to alteration or repairs to existing high-pressure-steam piping systems in which the integrity of the piping is not affected. Such alterations shall be visually inspected for compliance with the approved construction documents.

    Details

    Full details ›
    Calculated total $800.00

  • Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Lowest Floor Elevation FEMA (BC 109.3.2)

    109.3.2 Lowest floor elevation. In areas of special flood hazard, upon placement of the lowest floor, including the basement (for flood zone…

    Technical info

    109.3.2 Lowest floor elevation. In areas of special flood hazard, upon placement of the lowest floor, including the basement (for flood zone purposes), and prior to further vertical construction, the elevation inspection report required in Item 1 of Section G105.3 of Appendix G shall be submitted to the department.

    Details

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Masonry (BC 1704.5)

    1704.5 Masonry construction. Masonry construction shall be inspected and evaluated in accordance with the requirements of this section, depending on the structural…

    Technical info

    1704.5 Masonry construction. Masonry construction shall be inspected and evaluated in accordance with the requirements of this section, depending on the structural occupancy category of the building or structure or nature of occupancy, as defined by this code (see Table 1604.5 and Section 1616.2).

    Details

    SIGN-ON / Inspect / SIGN-OFF (package

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Mastic and Intumescent Fire-Resistant Coatings

    1704.12 Exterior insulation and finish systems (EIFS). Special inspections shall be required for all EIFS applications installed more than 15 feet (4572…

    Technical info

    1704.12 Exterior insulation and finish systems (EIFS). Special inspections shall be required for all EIFS applications installed more than 15 feet (4572 mm)‡ above adjacent finished grades.

    1704.12.1 The special inspection shall include verification of: compliance with approved construction documents for attachment to structure, installation of waterproofing membranes, weeps, drains, mold prevention features and conformance with the manufacturers’ installation guidelines.

    Details

    SIGN-ON / Inspect / SIGN-OFF (package

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Mechanical Demolition (BC 1704.19 BC 3306.6)

    1704.19 Structural safety during construction operations. Construction work consisting of structural alterations, excavation, underpinning, and demolition work that requires “design” as defined…

    Technical info

    1704.19 Structural safety during construction operations. Construction work consisting of structural alterations, excavation, underpinning, and demolition work that requires “design” as defined in Chapter 33, including earth shoring, underpinning, protection of adjacent structures and buildings, shall be subject to special inspection in accordance with this section. All alterations to existing structures in which loads are transferred from one structural system of structural elements to another, such as installation of columns or girders, replacement of existing bearing walls, the creation of openings or slots in existing walls, girders or floors, alteration of arches, rigid frames, trusses in frame buildings, or where the stability or integrity of a structural system is to be temporarily diminished shall be subject to special inspections in accordance with this section.

    Exception: Construction operations not requiring “design” as defined in Chapter 33.

    3306.6 Special inspection. Where mechanical demolition equipment, other than handheld devices, is to be used in the full or partial demolition of a building from within the building, or is to be used within the building to remove debris or move material, such demolition operation shall be subject to special inspection in accordance with the provisions of Chapter 17. The special inspector shall visit the site a minimum of three times: before demolition operations start, during demolition, and at the conclusion of demolition.

    Details

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Mechanical Systems (BC 1704.15)

    1704.15 Special inspection for mechanical systems. Mechanical systems regulated by Sections 107 and 507 and Chapters 10, 11 and 12 of the…

    Technical info

    1704.15 Special inspection for mechanical systems. Mechanical systems regulated by Sections 107 and 507 and Chapters 10, 11 and 12 of the New York City Mechanical Code shall be inspected for conformance with the approved construction documents.

    Details

    Sign on / Inspect / S-OFF (package) Including preparation of up to 3 Equipment Use Cards

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Non Potable Water Systems

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Open-Web Steel Joists and Joist Girders

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Pier Foundations (BC1704.9)

    1704.9 Pier foundations. Special inspection is required for all pier foundations designed in accordance with Section 1808.2.2.‡ Exception: Piers for support of…

    Technical info

    1704.9 Pier foundations. Special inspection is required for all pier foundations designed in accordance with Section 1808.2.2.‡

    Exception: Piers for support of lightweight fences, recreational equipment, site furnishings and similar construction, unless special inspection is specifically noted as required on the approved construction documents

    Details

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Polypropylene (“PP”) Piping Systems

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.1.1 (2022); BB #2015-020

    Work type(s): PL, SC

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Post Installed Anchors (BB#2014-2018, 2014-019

     

    Technical info

     

    Details

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Post-installed Anchors in Masonry

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.1.1 (2022); BB #2016-005

    Work type(s): ST, SC

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Prefabricated Parallel Chord Wood Trusses

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.1.1 (2022); BB #2012-004

    Work type(s): ST, SC

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Preliminary (28-116.2.1, BC 109.2)

    109.2 Preliminary inspection. Refer to Chapter 1 of Title 28 of the Administrative Code.

    Technical info

    109.2 Preliminary inspection. Refer to Chapter 1 of Title 28 of the Administrative Code.

    Details

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Prestressed Rock and Soil Anchors

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Public Assembly Emergency Lighting

    Public Assembly Emergency Lighting (28-116.2.2)Compliance inspections. In addition to the inspections specified in this code, the commissioner is authorized to make or…

    Technical info

    Public Assembly Emergency Lighting (28-116.2.2)
    Compliance inspections. In addition to the inspections specified in this code, the commissioner is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other laws that are enforced by the department.

    Details

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Raising and Moving of a Building (BC 1704.20.5)

      TR-1 Building Raising and Moving Inspection Raising and moving a building is one of the most […]

    Technical info

     

    Details

    TR-1 Building Raising and Moving Inspection

    Raising and moving a building is one of the most dramatic operations in urban construction — and one of the most tightly regulated under the NYC Building Code. Under BC Section 1704.20.5, any work involving the physical elevation or relocation of a building requires a special inspection by a registered agency throughout the operation. EZTR1 provides TR-1 progress inspections for building-raising and moving projects across all five boroughs.

     

    What triggers a BC 1704.20.5 inspection?

     

    A NYC DOB permit for raising or moving a building is required whenever:

     

    • A structure is lifted off its existing foundation to allow underpinning, foundation replacement, or the addition of a new basement or cellar level
    • A building is elevated to meet FEMA Base Flood Elevation (BFE) requirements — a common post-Sandy compliance project in the Rockaways (Queens), Staten Island waterfront neighborhoods, Red Hook (Brooklyn), and Gerritsen Beach
    • An existing building is physically relocated on the same lot or to an adjacent parcel — common in landmarked historic preservation projects and lot-consolidation scenarios

     

    How Building Raising Works in NYC

     

    The raising process uses synchronized hydraulic jacks placed at strategic points beneath the building’s sill plate, foundation walls, or steel grillage. The structure is incrementally lifted — typically in increments of a few inches at a time — while temporary cribbing (stacked timber or steel blocking) is inserted beneath the building to maintain stability between jack cycles. For relocation, the raised building is then placed on wheeled dollies or rollers and moved along a prepared pathway to its new position.

     

    What EZTR1 Inspects Under BC 1704.20.5

     

    EZTR1’s TR-1 progress inspectors monitor the following throughout the raising or moving operation:

     

    • Jack placement and load distribution — confirmed against the approved engineering documents before lifting commences
    • Incremental lift verification — each lift cycle is documented to confirm the building is rising uniformly without differential settlement or structural distress
    • Cribbing adequacy and stability — temporary support systems are verified to be adequate for the imposed loads at each stage
    • Foundation condition — before the building is set down on its new or modified foundation, the inspector confirms the receiving surface meets the approved design

     

    All findings are documented in the TR-1 special inspection report submitted to the NYC Department of Buildings.

     

    Ready to schedule your BC 1704.20.5 building-raising inspection? Contact EZTR1 to coordinate with your lifting contractor before work begins.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Seismic Isolation Systems (BC 1707.8)

    1707.8 Seismic isolation system. There shall be periodic special inspection during the fabrication and installation of isolator units and energy dissipation devices…

    Technical info

    1707.8 Seismic isolation system. There shall be periodic special inspection during the fabrication and installation of isolator units and energy dissipation devices if used as part of the seismic isolation system.

    1710.1 Conformance to standards. The design strengths and permissible stresses of any structural material that are identified by a manufacturer’s designation as to manufacture and grade by mill tests, or the strength and stress grade is otherwise confirmed to the satisfaction of the commissioner shall conform to the specifications and methods of design of accepted engineering practice or the rules of the department in the absence of applicable standards.

    Details

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • TR-1 SPECIAL INSPECTIONS

    TR-1 Seismic Resistance of Access Floors

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Seismic Resistance of Storage Racks

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Site Storm Drainage Disposal Detention Syste

    1704.20 Site storm drainage disposal and detention facilities. Storm water detention facilities, roof retention facilities and dry-well systems shall be inspected for…

    Technical info

    1704.20 Site storm drainage disposal and detention facilities. Storm water detention facilities, roof retention facilities and dry-well systems shall be inspected for conformance with the approved construction documents. Minor variations, based on actual site conditions, shall be acceptable at the discretion of the registered design professional of record. Verification shall include:

    1. Materials of construction.
    2. Bedding of pipe and facilities.
    3. Placement and installation of fill materials.
    4. Volume of drywell and detention facilities.
    5. Installation of volume flow control devices.
    6. Workmanship and quality of installation.
    7. Overall conformance with the approved construction documents. Hydrostatic testing of the detention system shall be required when the system is designed as watertight

    Details

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Smoke Control Systems (BC 1704.14)

    1704.14 Special inspection for smoke control. Smoke control systems shall be tested by a special inspector in accordance with Sections 1704.14.1 and…

    Technical info

    1704.14 Special inspection for smoke control. Smoke control systems shall be tested by a special inspector in accordance with Sections 1704.14.1 and 909.

    1704.14.1 Testing scope. The test scope shall be as follows:
    1. During erection of ductwork and prior to concealment for the purposes of leakage testing and recording of device location.
    2. Prior to occupancy and after sufficient completion for the purposes of pressure difference testing, flow measurements and detection and control verification.

    Details

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Sprayed Fire Resistant Materials (BC 1704.11)

    1704.11 Sprayed fire-resistant materials. Special inspections for sprayed fire-resistant materials applied to structural elements and decks shall be in accordance with Sections…

    Technical info

    1704.11 Sprayed fire-resistant materials. Special inspections for sprayed fire-resistant materials applied to structural elements and decks shall be in accordance with Sections 1704.11.1 through 1704.11.5. Special inspections shall be based on the fire-resistance design as designated in the approved construction documents.

    Details

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Sprinkler Systems (BC 1704.21)

    1704.21 Sprinkler system special inspection. New and altered sprinkler system systems shall be inspected in accordance with Section Sections 903 and 1704.21.1.…

    Technical info

    1704.21
    Sprinkler system special inspection. New and altered sprinkler system systems shall be inspected in accordance with Section Sections 903 and 1704.21.1. The permit holder responsible for the sprinkler work shall perform all required acceptance tests, complete and sign the appropriate contractor’s material and test certifications. The special inspector shall witness all required tests, and shall verify that all installations of all materials, fittings, hangers, assemblies and signage are in accordance with the approved construction documents, that painting of the sprinkler system required by Section 903.6 of this code has been performed and that the contractor has transmitted required maintenance literature and instruction to the owner. The special inspector shall verify that the material and test certification forms have been transmitted to the Fire Department and the Department of Buildings‡.

    Exception: Special inspection of The special inspector need not witness the hydrostatic pressure test shall not be required when such test is witnessed by the department.

    1704.21.1 Hydrostatic pressure testing. All new or altered sprinkler systems in buildings shall undergo successful hydrostatic pressure testing by a licensed master plumber or licensed fire suppression piping contractor in accordance with the requirements of this code, including Section 901.5, and NFPA 13.

    Details

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Standpipe Systems (BC 1704.22)

    1704.22 Standpipe system special inspection. New and altered standpipe systems shall be inspected in accordance with Section Sections 905 and 1704.22.1. The…

    Technical info

    1704.22 Standpipe system special inspection. New and altered standpipe systems shall be inspected in accordance with Section Sections 905 and 1704.22.1. The permit holder responsible for the standpipe work shall perform all required acceptance tests, and complete and sign the appropriate contractor’s material and test certifications. The special inspector shall witness all required tests, verify that installation of all materials, fittings, hangers, assemblies and signage are in accordance with the approved construction documents, that painting of the standpipe system required by Section 905.11 of this code has been performed and that the contractor has transmitted required maintenance literature and instruction to the owner. The special inspector shall verify that the material and test certification forms have been transmitted to the Fire Department and the Department of Buildings‡.

    Exception: Special inspection of The special inspector need not witness the hydrostatic pressure test shall not be required when such test is witnessed by the department.

    Details

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Structural Cold formed Steel (BC 1704.3.4)

    1704.3.4 Cold-formed steel construction. Cold-formed steel used structurally shall be subject to the special inspection requirements of Section 1704.3 and Table 1704.3.…

    Technical info

    1704.3.4 Cold-formed steel construction. Cold-formed steel used structurally shall be subject to the special inspection requirements of Section 1704.3 and Table 1704.3. In addition, the following requirements shall be inspected for compliance by the special inspector:
    1. The special inspector shall check for compliance with the requirements of Section 2209.1.3.
    2. Temporary bracing, shoring, jacks, etc., shall not be removed until the special inspector determines that they are no longer needed.

    Details

    Full details ›
    Calculated total $1,200.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Structural Safety-Stability (BC 1704.19)

    1704.19 Structural safety during construction operations. Construction work consisting of structural alterations, excavation, underpinning, and demolition work that requires “design” as defined…

    Technical info

    1704.19 Structural safety during construction operations. Construction work consisting of structural alterations, excavation, underpinning, and demolition work that requires “design” as defined in Chapter 33, including earth shoring, underpinning, protection of adjacent structures and buildings, shall be subject to special inspection in accordance with this section. All alterations to existing structures in which loads are transferred from one structural system of structural elements to another, such as installation of columns or girders, replacement of existing bearing walls, the creation of openings or slots in existing walls, girders or floors, alteration of arches, rigid frames, trusses in frame buildings, or where the stability or integrity of a structural system is to be temporarily diminished shall be subject to special inspections in accordance with this section.

    Exception: Construction operations not requiring “design” as defined in Chapter 33.

    Details

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Structural Steel Erecting and Bolting

    1704.3.2 Details. The special inspector shall perform an inspection of the steel frame to verify compliance with the details shown on the…

    Technical info

    1704.3.2 Details. The special inspector shall perform an inspection of the steel frame to verify compliance with the details shown on the approved construction documents, such as bracing, stiffening, member locations and proper application of joint details at each connection, including connections designed for seismic effects.

    1704.3.3 High-strength bolts. Installation of high-strength bolts shall be inspected in accordance with this section.

    1704.3.3.1 General. While the work is in progress, the special inspector shall determine that the requirements for bolts, nuts, washers and paint; bolted parts and installation and tightening in such standards are met. For bolts requiring pretensioning, the special inspector shall observe the preinstallation testing and calibration procedures when such procedures are required by the installation method or by project plans or specifications; determine that all plies of connected materials have been drawn together and properly snugged and monitor the installation of bolts to verify that the selected procedure for installation is properly used to tighten bolts. For joints required to be tightened only to the snug-tight condition, the special inspector need only verify that the connected materials have been drawn together and properly snugged.

    1704.3.3.2 Periodic monitoring. Monitoring of bolt installation for pretensioning is permitted to be performed on a periodic basis when using the turn-of-nut method with matchmarking techniques, the direct tension indicator method or the alternate design fastener (twist-off bolt) method. Joints designated as snug tight need be inspected only on a periodic basis.

    1704.3.3.3 Continuous monitoring. Monitoring of bolt installation for pretensioning using the calibrated wrench method or the turn-of-nut method without matchmarking shall be performed on a continuous basis.

    Details

    What Structural Steel Special Inspection Looks

    On a busy New York City high-rise construction site, structural steel erection can advance several floors per week. EZTR1’s certified special inspectors are on the steel deck alongside the ironworkers — verifying each bolted connection as it is assembled, before the work is covered by the next floor or fireproofing is applied.

     

    Typical NYC projects that require this inspection:

     

    • High-rise residential towers in Manhattan, Long Island City, and Downtown Brooklyn — where moment frames, braced frames, and composite floor systems require continuous or periodic bolt monitoring
    • Mixed-use commercial/residential buildings (5–40+ stories) subject to NYC BC Chapter 17 special inspection requirements from the first structural steel connection
    • Additions and structural steel transfers in existing buildings — including cantilever additions and steel moment frame insertions in landmarked buildings

     

    Why it matters: An improperly pretensioned high-strength bolt can slip under wind or seismic load, potentially causing a joint to lose its designed stiffness. NYC’s seismic design requirements mean that many steel connections must be verified as fully pretensioned — not just snug-tight — before the structure is loaded.

     

    EZTR1’s Inspector Qualifications

     

    EZTR1’s structural steel special inspectors hold ICC Special Inspector certifications for structural steel and are registered with the NYC Department of Buildings as qualified special inspection agencies under 1 RCNY § 101-06. Every inspection report is prepared, signed, and submitted directly to the DOB.

     

    Ready to schedule your structural steel special

    inspection? Contact EZTR1 to confirm availability for your project’s erection schedule.

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Structural Steel – Welding BC 1704.3.1

    VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED STANDARDa BC REFERENCE 1. Material verification of high-strength bolts, nuts and washers: a. Identification markings to…

    Technical info

    VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED
    STANDARDa BC REFERENCE

    1. Material verification of high-strength bolts, nuts and washers:
    a. Identification markings to conform to ASTM standards specified in the approved construction documents.
    Applicable ASTM material specifications; AISC 335, Section A3.4; AISC LRFD, Section A3.3 —
    b. Manufacturer’s certificate of compliance required.

    2. Inspection of high-strength bolting:
    a. Bearing-type connections.
    Note b AISC LRFD Section M2.5 1704.3.3
    b. Slip-critical connections.

    3. Material verification of structural steel:
    a. Identification markings to conform to ASTM standards specified in the approved construction documents.
    — — ASTM A 6 or ASTM A 568 1708.4
    b. Manufacturers’ certified mill test reports.

    — — ASTM A 6 or ASTM A 568
    4. Material verification of weld filler materials:
    a. Identification markings to conform to AWS specification in the approved construction documents.
    — — AISC, ASD, Section A3.6;
    AISC LRFD, Section A3.5 —
    b. Manufacturer’s certificate of compliance required.

    5. Inspection of welding:
    a. Structural steel:
    1) Complete and partial penetration groove welds.
    AWS D1.1 1704.3.1
    2) Multipass fillet welds.
    3) Single—pass fillet welds > 5/16″
    4) Single-pass fillet welds ≤ 5/16″
    5) Floor and roof deck welds.
    — X AWS D1.3 —
    b. Reinforcing steel:
    — — AWS D1.4
    ACI 318: 3.5.2 1903.5.2
    1) Verification of weldability of reinforcing steel other than ASTM A 706.
    2) Reinforcing steel-resisting flexural and axial forces in intermediate and special moment frames, and boundary elements of special reinforced concrete shear walls and shear reinforcement.
    3) Shear reinforcement.
    Note a —
    4) Other reinforcing steel.

    6. Inspection of steel frame joint details for compliance with approved constructio

    Details

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Structural Steel-Details

    1704.3.2 Details. The special inspector shall perform an inspection of the steel frame to verify compliance with the details shown on the…

    Technical info

    1704.3.2 Details. The special inspector shall perform an inspection of the steel frame to verify compliance with the details shown on the approved construction documents, such as bracing, stiffening, member locations and proper application of joint details at each connection, including connections designed for seismic effects.

    1704.3.3 High-strength bolts. Installation of high-strength bolts shall be inspected in accordance with this section.

    1704.3.3.1 General. While the work is in progress, the special inspector shall determine that the requirements for bolts, nuts, washers and paint; bolted parts and installation and tightening in such standards are met. For bolts requiring pretensioning, the special inspector shall observe the preinstallation testing and calibration procedures when such procedures are required by the installation method or by project plans or specifications; determine that all plies of connected materials have been drawn together and properly snugged and monitor the installation of bolts to verify that the selected procedure for installation is properly used to tighten bolts. For joints required to be tightened only to the snug-tight condition, the special inspector need only verify that the connected materials have been drawn together and properly snugged.

    1704.3.3.2 Periodic monitoring. Monitoring of bolt installation for pretensioning is permitted to be performed on a periodic basis when using the turn-of-nut method with matchmarking techniques, the direct tension indicator method or the alternate design fastener (twist-off bolt) method. Joints designated as snug tight need be inspected only on a periodic basis.

    1704.3.3.3 Continuous monitoring. Monitoring of bolt installation for pretensioning using the calibrated wrench method or the turn-of-nut method without matchmarking shall be performed on a continuous basis.

    Details

    Full details ›
    Calculated total $1,200.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Structural Wood Frame Inspection (BC110.3.3)

    110.3.3  Frame inspection. Framing inspections shall be performed to determine compliance with the approved construction documents. Exception: Work regulated and inspected under…

    Technical info

    110.3.3  Frame inspection. Framing inspections shall be performed to determine compliance with the approved construction documents.

    Exception: Work regulated and inspected under Chapter 17.

    Details

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Subgrade Inspection (BC 1704.7.1

    1704.7.1 Subgrade inspection.Immediately prior to placement of the footings, foundations, fill or other supporting materials the special inspector shall determine that the…

    Technical info

    1704.7.1 Subgrade inspection.Immediately prior to placement of the footings, foundations, fill or other supporting materials the special inspector shall determine that the site has been preparedand isin accordance with the approved geotechnical report

    Details

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Subsurface Conditions-Fill Placement & In-Place Density (BC 1704.7.2-3)

    1704.7.1 Subgrade inspection.Immediately prior to placement of the footings, foundations, fill or other supporting materials the special inspector shall determine that the…

    Technical info

    1704.7.1 Subgrade inspection.Immediately prior to placement of the footings, foundations, fill or other supporting materials the special inspector shall determine that the site has been preparedand isin accordance with the approved geotechnical report

    Details

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Tenant Protection Plan Weekly Inspection Compliance

    TPP WEEKLY INSPECTION PRICE IS PER INSPECTION. A WEEKLY INSPECTION IS REQUIRED.   (As per 2022 NYCBC, Inspection is required 72 hours…

    Technical info

    TPP WEEKLY INSPECTION

    PRICE IS PER INSPECTION. A WEEKLY INSPECTION IS REQUIRED.

     

    (As per 2022 NYCBC, Inspection is required 72 hours prior to construction start date, plus once weekly during the entire construction period), THE OWNER IS RESPONSIBLE TO AUTHORIZE AND PAY FOR, MINIMUM 48 HOUR PRIOR TO SCHEDULING, ALL INSPECTIONS DURING THE ENTIRE CONSTRUCTION PERIOD. AKS WILL NOT ATTEND WEEKLY INSPECTION WITHOUT PRIOR PAYMENT AND IS NOT RESPONSIBLE FOR DOB VIOLATIONS ISSUED DUE TO LAPSE IN INSPECTION DUE TO NON-PAYMENT. ADDITIONAL WEEKLY INSPECTIONS CAN BE ALWAYS BE SCHEDULED ON LINE AT www.EZTR1.com

    A Tenant Protection Plan (TPP) outlines what steps the contractor and owner will take to protect tenants living in buildings under construction/renovation to avoid or limit service disruptions and mitigate the negative impacts of construction.  

    Prior to obtaining a construction permit, a Registered Design Professional must submit a TPP if there is at least one occupied dwelling unit. Each construction permit requires its own TPP that outlines tenant protections specific to that scope of work. The elements of the TPP may vary depending on the nature and scope of the work, but at a minimum shall make detailed and specific provisions for:

    • Egress. Clarify how adequate egress will be maintained during construction.
    • Fire Safety. Identify safety measures to maintain fire safety during construction.
    • Health Requirements. Specify methods to be used for dust control, disposal of construction debris, pest control and maintenance of sanitary facilities. Owners must include a statement certifying compliance with applicable laws and filings relating to lead and asbestos.
    • Compliance with Housing Standards. Demonstrate compliance with  the New York City Housing Maintenance Code, and New York State Multiple Dwelling Law shall be strictly observed.
    • Structural Safety. Identify specific measures to maintain  structural stability during construction.
    • Noise Restrictions. Identify the specific means and methods used to limit noise to acceptable levels in accordance with the NYC Noise Control Code. 
    • Maintaining Essential Services. Describe specific means and methods to be used to maintain heat, hot water, cold water, gas, electricity, or other utility services, in accordance with the NYC Housing Maintenance Code.  Specify if a disruption of any such service is anticipated during the work, the expected duration of such disruption, the means and methods that will be taken to minimize such disruption, including the provision of sufficient  alternatives for such service during the disruption. Notification of the disruption must be given to all affected occupants of occupied dwelling units.

     

    1705.26.1 Inspection frequency.

    Special inspections shall be performed throughout the duration of the tenant protection plan at sufficient periodic intervals to verify compliance with the tenant protection plan throughout the course of work. At a minimum, inspections shall be performed:

       1.   Prior to the start of construction and/or demolition to document conditions prior to work;

       2.   At the start of construction and/or demolition;

       3.   Once per week during construction and/or demolition;

       4.   After a tenant protection plan violation has been issued to verify that the violation was corrected;

       5.   When the location of the alteration or construction operations performed in conjunction with the tenant protection plan has moved to another location; and

       6.   Whenever construction or demolition operations have changed, requiring changes in methods of protection.

     

    1705.26.2 Reporting.

    A written record of the special inspections performed for the tenant protection plan shall be maintained in a log prepared by the special inspector. The log shall include an entry for each inspection and shall indicate that the alteration or construction operation is being performed in accordance with the tenant protection plan. Copies of the special inspection log book shall be maintained at the job site, and at the office of the special inspector, and shall be available for use and review at all reasonable times, until the work subject to special inspection is complete.

    Full details ›
    Calculated total $750.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Underpinning (BC 1704.9.1)

    1704.9.1 Underpinning operations. Special inspection is required for underpinning operations in accordance with Sections 1704.19 and 1814.

    Technical info

    1704.9.1 Underpinning operations. Special inspection is required for underpinning operations in accordance with Sections 1704.19 and 1814.

    Details

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Vertical Masonry Foundation Elements (BC 1704.9)

      TR-1 Vertical Masonry Foundation Elements Vertical masonry foundation elements are a required special inspection category under […]

    Technical info

     

    Details

    TR-1 Vertical Masonry Foundation Elements

    Vertical masonry foundation elements are a required special inspection category under NYC Building Code Section 1704.9, applying to new construction where concrete masonry units (CMU), brick, or other masonry materials are used in load-bearing foundation walls, basement walls, party walls, or below-grade structural elements. Unlike wood or steel framing inspections, BC 1704.9 masonry inspection is a Chapter 17 special inspection — meaning it must be performed by a registered special inspection agency such as EZTR1, not simply a DOB progress inspector.

     

    Where this inspection applies in NYC construction

     

    Vertical masonry foundation inspections are most commonly required in:

     

    • Brooklyn and Manhattan brownstone and row house construction — where CMU block or structural brick forms the bearing wall system from the foundation up
    • Low-rise mixed-use buildings — where CMU foundation walls and party walls are specified in the approved structural drawings
    • New high-rise foundation systems — where masonry retaining or foundation walls are used in below-grade construction on constrained urban sites

     

    What EZTR1 Inspects Under BC 1704.9

     

    EZTR1’s certified special inspectors verify masonry construction at each required inspection stage:

     

    • Masonry unit placement — units are set in conformance with the approved drawings for wall thickness, coursing height, and bond pattern
    • Mortar joint thickness and consistency — joints are within the specified range and fully bedded
    • Grout pour and lift heights — grout is placed in lifts not exceeding code-specified maximums per the approved mix design
    • Reinforcing bar placement — vertical and horizontal rebar is positioned, sized, and spaced per the structural drawings before grouting occurs
    • Wall height and alignment — walls are plumb and dimensionally compliant with approved documents at each inspection level

     

    Common Deficiencies Found

     

    The most frequent findings in NYC masonry inspections include improper grout consolidation in CMU cores, rebar displaced from specified location before grouting, and mortar joint thickness outside the ⅜”–⅝” range required by BC 2104.

     

    All findings are documented in the TR-1 special inspection report filed directly with the NYC Department of Buildings.

     

    Ready to schedule your BC 1704.9 masonry special inspection? Contact EZTR1 to coordinate with your masonry contractor.

    Full details ›
    Calculated total $1,500.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Wall Panels Curtain Walls and Veneers

    1704.10.1 Special inspection for wall panels, curtain walls and veneers. The special inspector shall become familiar with and retain a copy of…

    Technical info

    1704.10.1 Special inspection for wall panels, curtain walls and veneers. The special inspector shall become familiar with and retain a copy of the construction documents, shop drawings, instructions for the sequence of component installation, samples and/or mock-ups, if supplied. The special inspector shall field check the site conditions at the time the structure is prepared for component installation to verify: that the supporting structure is properly aligned and within deign tolerances, that required inserts are properly installed, that framing components are properly sized, aligned, and without structural defects or weakness, that anchors are properly placed, welded, bolted and finished as applicable, that weeps, flashings and tubes are in place and properly drained, that joinery and end dams are properly sealed per plans, that sealing materials with sufficient elongation capability are provided, that gaskets meet specifications, that materials are installed to compensate for horizontal and vertical movement in accordance with the design and the manufacturers’ guidelines and that any other observations pertinent to safety of performance of the wall system have been performed.

    1704.10.2 Unsafe wall conditions. The special inspector shall report any immediate hazards to the department.

    Details

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Wood – Instal. of Hi Load Diaphr (BC1704.6.1)

    1704.6.1 Fabrication of high-load diaphragms. High-load diaphragms using values from Table 2306.3.2 shall be installed with special inspections as indicated in Section…

    Technical info

    1704.6.1 Fabrication of high-load diaphragms. High-load diaphragms using values from Table 2306.3.2 shall be installed with special inspections as indicated in Section 1704.1. The special inspector shall inspect the wood structural panel sheathing to ascertain whether it is of the grade and thickness shown on the approved construction documents. Additionally, the special inspector must verify the nominal size of framing members at adjoining panel edges, the nail or staple diameter and length, the number of fastener lines and that spacing between fasteners in each line and at edge margins agrees with the approved construction documents.

    Details

    Full details ›
    Calculated total $1,000.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Wood – Prefabricated I-Joists

    1704.6.4 Prefabricated wood I-joists. The fabrication of prefabricated wood I-joists shall be subject to special inspections in accordance with Section 1704.2 and…

    Technical info

    1704.6.4 Prefabricated wood I-joists. The fabrication of prefabricated wood I-joists shall be subject to special inspections in accordance with Section 1704.2 and the requirements of Section 2303.12.

    1704.6.4.1 Erection. The use of prefabricated wood I-joists shall be subject to special inspection for compliance with the approved construction documents, the requirements of Section 1704.1, and the following:
    1. All installed materials shall be clean, straight, and otherwise undamaged. Members and parts shall not be stretched, bent, or otherwise distorted unless such forming is in the integral part of the design. The special inspector shall ensure that damaged members are not used for construction.
    2. Profiles of members used structurally shall conform to the dimensions specified in the approved construction documents. The installation shall be inspected for compliance with the approved construction documents regarding locations, positions, beam separators, bearing surfaces, fasteners, screws, bolts and bracing, as applicable.
    3. The size, location, and number of penetrations shall be inspected for compliance with the approved construction documents and manufacturer’s instructions.
    4. Temporary bracing, shoring, jacks, etc., shall not be removed until the special inspector determines that they are no longer needed.

    Details

    SIGN-ON / Inspect / SIGN-OFF (package

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Wood Instal of Metal Pl Connected Trusses

    1704.6.3 Metal plate connected wood trusses. In addition to the requirements of Section 1704.1, metal-plate-connected wood trusses shall be subject to special…

    Technical info

    1704.6.3 Metal plate connected wood trusses. In addition to the requirements of Section 1704.1, metal-plate-connected wood trusses shall be subject to special inspection in accordance with Section 1704.6.3.1.
    1704.6.3.1 Erection. The use of all metal-plate-connected wood trusses shall be subject to special inspection for compliance with the approved construction documents, the requirements of Section 1704.1, and the following:
    1. All installed materials shall be clean, straight, and otherwise undamaged. Members and parts shall not be stretched, bent, or otherwise distorted unless such forming is in the integral part of the design. The special inspector shall ensure that damaged members are not used for construction.
    2. Profiles of members used structurally shall conform to the dimensions specified in the approved construction documents. The installation shall be inspected for compliance with the approved construction documents regarding locations, positions, beam separators, bearing surfaces, fasteners, screws, bolts and bracing, as applicable.
    3. Temporary bracing, shoring, jacks, etc., shall not be removed until the special inspector determines that they are no longer needed.
    4. Where prefabricated metal-plate-connected wood trusses are utilized, such prefabricated wood structural elements and assemblies shall also comply with Section 1704.2. Where any metal-plate connectors are utilized in site-built assemblies, such connections and assemblies shall be subject to special inspection for compliance with the requirements of the approved construction documents and manufacturers’ instructions.

    Details

    Full details ›
    Calculated total $800.00

  • TR-1 SPECIAL INSPECTIONS

    TR-1 Wood Seismic Resistance

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

Project Too Big Or Complex For Menu Pricing? Contact Us For A Detailed Project Specific Proposal.

Not every project fits our online catalog. Share your project details, and our team will review your requirements, recommend the right inspection services, and provide a custom quote.

Request a Custom Quote