Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.
Related products
-
TR-1 SPECIAL INSPECTIONS
TR-1 Footing Foundation (BC 109.3.1)
109.3.1 Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
-
TR-1 SPECIAL INSPECTIONS
TR-1 Non Potable Water Systems
-
TR-1 SPECIAL INSPECTIONS
TR-1 Construction Utilizing CLT or SCL Type IV
