1704.6.1 Fabrication of high-load diaphragms. High-load diaphragms using values from Table 2306.3.2 shall be installed with special inspections as indicated in Section 1704.1. The special inspector shall inspect the wood structural panel sheathing to ascertain whether it is of the grade and thickness shown on the approved construction documents. Additionally, the special inspector must verify the nominal size of framing members at adjoining panel edges, the nail or staple diameter and length, the number of fastener lines and that spacing between fasteners in each line and at edge margins agrees with the approved construction documents.
TR-1 Wood – Instal. of Hi Load Diaphr (BC1704.6.1)
$1,000.00
SKU: EZTR1-P0070
Category: TR-1 SPECIAL INSPECTIONS
Related products
-
TR-1 SPECIAL INSPECTIONS
TR-1 Emergency Power Systems (Generators)
1704.13 Special case. Special inspections shall be required for proposed work that is, in the opinion of the commissioner, unusual in its…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Subsurface Conditions-Fill Placement & In-Place Density (BC 1704.7.2-3)
1704.7.1 Subgrade inspection.Immediately prior to placement of the footings, foundations, fill or other supporting materials the special inspector shall determine that the…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Lowest Floor Elevation FEMA (BC 109.3.2)
109.3.2 Lowest floor elevation. In areas of special flood hazard, upon placement of the lowest floor, including the basement (for flood zone…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Prestressed Rock and Soil Anchors
