109.3.1 Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94, the concrete need not be on the job.
Related products
-
TR-1 SPECIAL INSPECTIONS
TR-1 Wood Off Site Fabr Elements (BC1704.6)
1704.6 Wood construction. Special inspections of the fabrication process of prefabricated wood structural elements and assemblies shall be in accordance with Section…
-
TR-1 SPECIAL INSPECTIONS
TR-1 PVT Onsite Disposal System
TR-1 Private Onsite Disposal System Inspection A private (PVT) onsite disposal system is a self-contained sewage […]
-
TR-1 SPECIAL INSPECTIONS
TR-1 Flood Zone Compliance (BC G105)
109.3.2 lowest floor elevation. In areas of special flood hazzard, upon placement of the lowest floor, including the basement (for flood zone…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Preliminary (28-116.2.1, BC 109.2)
109.2 Preliminary inspection. Refer to Chapter 1 of Title 28 of the Administrative Code.
