109.2 Preliminary inspection. Refer to Chapter 1 of Title 28 of the Administrative Code.
Related products
-
TR-1 SPECIAL INSPECTIONS
TR-1 Private On-site Storm Water Drainage Disposal Systems and Detention Facilit
1704.21.1.2 Soil percolation tests.Prior to the approval of construction documents, soil percolation tests shall be performed in accordance with the provisions of…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Structural Cold formed Steel (BC 1704.3.4)
1704.3.4 Cold-formed steel construction. Cold-formed steel used structurally shall be subject to the special inspection requirements of Section 1704.3 and Table 1704.3.…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Subsurface Conditions-Fill Placement & In-Place Density (BC 1704.7.2-3)
1704.7.1 Subgrade inspection.Immediately prior to placement of the footings, foundations, fill or other supporting materials the special inspector shall determine that the…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Public Assembly Emergency Lighting
Public Assembly Emergency Lighting (28-116.2.2)Compliance inspections. In addition to the inspections specified in this code, the commissioner is authorized to make or…
