TR-1 Post Installed Anchors (BB#2014-2018, 2014-019
$800.00
SKU: EZTR1-P0111
Category: TR-1 SPECIAL INSPECTIONS
Related products
-
TR-1 SPECIAL INSPECTIONS
TR-1 High Temperature Fuel Gas Piping (Welding) (BC 1704.19)
1704.19 High-pressure-gas piping.High-pressure-gas pipingregulated in Section 406 of the New York City FuelGas Codeshall be subject to special inspection in accordance with…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Flood Zone Compliance (BC G105)
109.3.2 lowest floor elevation. In areas of special flood hazzard, upon placement of the lowest floor, including the basement (for flood zone…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Frame Inspection (BC 109.3.3)
109.3.3 Frame inspection. Framing inspections shall be performed to determine compliance with the approved construction documents. Exception: Work regulated and inspected under…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Structural Steel – Welding BC 1704.3.1
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED STANDARDa BC REFERENCE 1. Material verification of high-strength bolts, nuts and washers: a. Identification markings to…
