1704.19 High-pressure-gas piping.High-pressure-gas pipingregulated in Section 406 of the New York City FuelGas Codeshall be subject to special inspection in accordance with this section.Special inspection of seismic bracing shall be performed in accordance with Section 1707.7
TR-1 High-Pressure Fuel-Gas Piping (Welding) (BC 1704.19)
$800.00
SKU: EZTR1-P0001
Category: TR-1 SPECIAL INSPECTIONS
Related products
-
TR-1 SPECIAL INSPECTIONS
TR-1 Tenant Protection Plan Weekly Inspection Compliance
TPP WEEKLY INSPECTION PRICE IS PER INSPECTION. A WEEKLY INSPECTION IS REQUIRED. (As per 2022 NYCBC, Inspection is required 72 hours…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Energy Code Compliance Inspections (BC 110.3.5)
110.3.5 Energy code compliance inspections.Inspections shall be made to determine compliance with approved construction documents. per TR-8
-
TR-1 SPECIAL INSPECTIONS
TR-1 Fire Resistance Rated Construction (BC 110.3.4)
110.3.4 Fire-resistance-rated construction inspection.Fire-resistance-rated construction shall be inspected to determine compliance with the…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Wood Seismic Resistance
