TR-8 Air Barrier – Testing(IA7,IIA7)

$500.00

Calculated total $500.00

SKU: EZTR1-P0027 Category:
Air barrier – testing: Testing must be performed in accordance with section
ECC 402.4.1.2 or R402.4.1.3 and shall be accepted if the building meets the requirements detailed in such section. Test results must be retained in accordance with the provisions of Title 28 Projection factors: Where the energy analysis utilized a projection factor > 0, the projection dimensions of
overhangs, eaves or permanently attached shading devices shall be verified for conformance with approved plans by visual inspection. Air barrier testing: Testing [must] must be performed in accordance with section ECC C402.5.1.3.1 or ASHRAE 90.1 section 5.4.3.1.3, and shall be accepted if the building  meets the requirements detailed in such section. Test results shall be retained in accordance with the provisions of Title 28 of the Administrative Code. Testing must be performed by a third-party independent of the contractor and acceptable to the department.  

Project Too Big Or Complex For Menu Pricing? Contact Us For A Detailed Project Specific Proposal.

Not every project fits our online catalog. Share your project details, and our team will review your requirements, recommend the right inspection services, and provide a custom quote.

Request a Custom Quote