TR-8 Energy Inspections in NYC
-
TR-8 ENERGY INSPECTIONS
EN-2 Energy Code Analysis (BC 109.3.5)
NYC Energy Code Analysis as required by NYCDOB, limited to small projects, 4000sf or less. Energy code compliance Analysis shall be made to…
Technical info
Full details ›NYC Energy Code Analysis as required by NYCDOB, limited to small projects, 4000sf or less.
Energy code compliance Analysis shall be made to determine compliance with NYC Energy Conservation Code.
Details
per TR-8
-
TR-8 ENERGY INSPECTIONS
TR-8 Shutoff Dampers (IB2), (IIB2)
1RCNY IB2Not less than 20% of installed automatic or gravity dampers, and a minimum of one of each type, shall be visually…
Technical info
Full details ›1RCNY IB2
Not less than 20% of installed automatic or gravity dampers, and a minimum of one of each type, shall be visually inspected and physically tested for proper operation.1RCNY IIB2
Dampers for stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral to the building envelope shall be visually inspected to verify that such dampers, except where permitted to be gravity dampers, comply with approved construction drawings.
Manufacturer’s literature shall be reviewed to verify that the product has been tested and found to meet the standard.Details
Energy Shutoff Dampers vs. Fire Dampers
A common source of confusion on NYC construction sites is the difference between energy shutoff dampers — which are required under the Energy Conservation Code and inspected during TR-8 — and fire or smoke dampers, which are life-safety devices inspected under separate NYC Fire Code and Mechanical Code requirements. These are different systems with different inspectors and different code sections. TR-8 shutoff damper inspections address energy performance only.
What 1RCNY §IB2 requires for Class 1 buildings (1- and 2-family homes):
The ECC requires that at least 20% of all installed automatic or gravity dampers — with a minimum of one of each type present — be both visually inspected and physically tested for proper operation. Physical testing means the inspector manually operates the damper to confirm it opens and closes as designed, preventing conditioned air from escaping through HVAC ductwork when equipment is off.
Automatic vs. gravity dampers — why the distinction matters:
- Automatic dampers are motor-actuated and close positively when commanded by the building’s HVAC controls. They are required in most Class 2 commercial and high-rise residential applications.
- Gravity dampers close by their own weight when airflow stops. They are lower-cost and permitted in certain residential applications, but must be verified to close fully without binding, warping, or obstructions.
How EZTR1 Conducts the Inspection
EZTR1’s certified progress inspectors identify the full damper inventory on the approved mechanical drawings, select the representative 20% sample, physically cycle each damper, and document results in the TR-8 report filed with the NYC Department of Buildings.
Ready to schedule your TR-8 shutoff damper inspection? Contact EZTR1 to coordinate with your mechanical contractor.
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Barrier – Testing(IA7,IIA7)
Air barrier – testing: Testing must be performed in accordance with section ECC 402.4.1.2 or R402.4.1.3 and shall be accepted if the building…
Technical info
Full details ›Air barrier – testing: Testing must be performed in accordance with section
ECC 402.4.1.2 or R402.4.1.3 and shall be accepted if the building meets the requirements detailed in such section. Test results must be retained in accordance with the provisions of Title 28 Projection factors: Where the energy analysis utilized a projection factor > 0, the projection dimensions of
overhangs, eaves or permanently attached shading devices shall be verified for conformance with approved plans by visual inspection. Air barrier testing: Testing [must] must be performed in accordance with section ECC C402.5.1.3.1 or ASHRAE 90.1 section 5.4.3.1.3, and shall be accepted if the building meets the requirements detailed in such section. Test results shall be retained in accordance with the provisions of Title 28 of the Administrative Code. Testing must be performed by a third-party independent of the contractor and acceptable to the department. -
TR-8 ENERGY INSPECTIONS
TR-8 Air Barrier Continuity Plan Testing/ Inspection(IIA8)
Air barrier continuity plan testing: Each unique air barrier joint or seam must be tested or inspected for compliance. Documentation includes the…
Technical info
Full details ›Air barrier continuity plan testing:
Each unique air barrier joint or seam
must be tested or inspected for
compliance. Documentation includes the
method of test performed on each unique
air barrier joint or seam and the results of
the test. If an air barrier joint or seam has
a deficiency, the deficiency must be
noted, and retested until it complies with
the testing requirements. Test results
must be retained in accordance with the
provisions of Title 28 of the
Administrative Code.
Testing must be performed by a thirdparty independent of the contractor and
acceptable to the department.Project-specific pricing requiredRequest a Quote -
TR-8 ENERGY INSPECTIONS
TR-8 Air Barrier-Visual Inspection(IA6,IIA6)
Air barrier – visual inspection: Openings and penetrations in the building envelope, including site-built fenestration and doors, must be visually inspected to verify that…
Technical info
Full details ›Air barrier – visual inspection: Openings and penetrations in the building envelope, including site-built fenestration and doors, must be visually inspected to verify that they are properly sealed, in accordance with Table 402.4.2. Air sealing and insulation – visual inspection: Openings and penetrations in the building envelope, including site-built fenestration and doors, must be visually inspected to verify that a continuous air barrier around the envelope forms an air-tight enclosure. The progress inspector must visually inspect to verify that materials and/or assemblies have been tested and meet the requirements of the respective standards, or that the building is tested and meets the requirements of the standard, in accordance with the standard(s) cited in the approved plans. -
TR-8 ENERGY INSPECTIONS
TR-8 Air Sealing and Insulation – Testing
1RCNY IA7Testing shall be performed in accordance with section ECC 402.4.2.1 and shall be accepted if the building meets the requirements detailed…
Technical info
Full details ›1RCNY IA7
Testing shall be performed in accordance with section ECC 402.4.2.1 and shall be accepted if the building meets the requirements detailed in such section. Test results shall be retained in accordance with the provisions of Title 28.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Sealing and Insulation – Visual
1RCNY IA6Openings and penetrations in the building envelope, including site-built fenestration and doors, shall be visually inspected to verify that they are…
Technical info
Full details ›1RCNY IA6
Openings and penetrations in the building envelope, including site-built fenestration and doors, shall be visually inspected to verify that they are properly sealed, in accordance with Table 402.4.2.1RCNY IIA6
Openings and penetrations in the building envelope, including site-built fenestration and doors, shall be visually inspected to verify that a continuous air barrier around the envelope forms an air-tight enclosure.
The progress inspector shall visually inspect to verify that materials and/or assemblies have been tested and meet the requirements of the respective standards, or that the building is tested and meets the requirements of the standard, in accordance with the standard(s) citedDetails
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Sealing and Insulation Testing/ Blower Door Test Report
Testing shall be performed in accordance with section ECC 402.4.2.1 and shall be accepted if the building meets the requirements detailed in…
Technical info
Full details ›Testing shall be performed in accordance with section ECC 402.4.2.1 and shall be accepted if the building meets the requirements detailed in such section. Test results shall be retained in accordance with the provisions of Title 28.
The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding three air changes per hour. Testing shall be conducted in accordance with ASTM E 779 or ASTM E 1827 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Details
Project-specific pricing requiredRequest a Quote -
TR-8 ENERGY INSPECTIONS
TR-8 Dampers Integral to Building Envelope
1RCNY IB2Not less than 20% of installed automatic or gravity dampers, and a minimum of one of each type, shall be visually…
Technical info
Full details ›1RCNY IB2
Not less than 20% of installed automatic or gravity dampers, and a minimum of one of each type, shall be visually inspected and physically tested for proper operation.1RCNY IIB2
Dampers for stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral to the building envelope shall be visually inspected to verify that such dampers, except where permitted to be gravity dampers, comply with approved construction drawings.
Manufacturer’s literature shall be reviewed to verify that the product has been tested and found to meet the standard.Details
What Makes a Damper Integral to the Building
A damper is considered integral to the building envelope when it is physically installed within an exterior wall, roof assembly, or floor/ceiling assembly at the point where an HVAC duct, shaft, or ventilation opening penetrates the building’s thermal and air boundary. These are not interior zone dampers — they are the last line of defense between the conditioned interior of the building and the outdoor environment.
In NYC construction, this category includes:
- Outdoor air intake dampers — installed where fresh air enters the mechanical system through an exterior wall penetration
- Exhaust air dampers — at the termination point of kitchen, bathroom, or dryer exhaust systems through the building envelope
- Stair and elevator shaft vent dampers — at the top or exterior wall penetrations of shaft enclosures, required to limit stack-effect air movement
- Relief air dampers — at exterior wall openings where pressurized supply air is exhausted to maintain building pressure balance
Under 1RCNY §IIB2 (Class 2 buildings), these dampers must comply with approved construction drawings and be supported by manufacturer’s literature confirming the product has been independently tested to meet the required standard — a higher bar than simple visual inspection.
How EZTR1 Inspects
EZTR1’s certified progress inspectors verify damper location against approved DOB drawings, confirm product compliance documentation is on file, and conduct physical operation checks at each envelope penetration point. All findings are documented in the TR-8 report filed with the NYC Department of Buildings.
Ready to schedule your TR-8 building envelope damper inspection? Contact EZTR1 to coordinate with your construction schedule.
-
TR-8 ENERGY INSPECTIONS
TR-8 Duct Leakage Testing
1RCNY IB6Where the air handler and/or some ductwork is in unconditioned space, duct-leakage testing shall be performed either after rough-in or post-construction…
Technical info
Full details ›1RCNY IB6
Where the air handler and/or some ductwork is in unconditioned space, duct-leakage testing shall be performed either after rough-in or post-construction to ensure compliance with ECC 403.2.2. Not less than 20% of such ductwork shall be tested.1RCNY IIB6
For duct systems designed to operate at static pressures in excess of 3 inches w.g. (746 Pa), representative sections, as determined by the progress inspector, totaling at least 25% of the duct area, per ECC 503.2.7.1.3, shall be tested to verify that actual air leakage is below allowable amounts.Details
How Duct Leakage Testing Works
Duct leakage testing uses a calibrated pressurization fan — commonly called a duct blaster — to pressurize the supply or return duct system to a standard test pressure while all registers are sealed. The measured air flow required to maintain that pressure represents the leakage rate of the duct system. A high leakage rate means conditioned air is escaping into unconditioned spaces such as wall cavities, attic chases, or mechanical rooms, directly wasting energy and degrading system performance.
NYC Class 1 vs. Class 2 requirements:
- Class 1 (1RCNY IB6): Applies when the air handler or any portion of the ductwork is located in unconditioned space. Testing may be performed at rough-in (before insulation is installed) or post-construction. A minimum of 20% of affected ductwork must be tested per ECC Section 403.2.2.
- Class 2 (1RCNY IIB6): Applies to duct systems operating at static pressures exceeding 3 inches w.g. (746 Pa). A progress inspector selects representative sections totaling at least 25% of the duct area for testing per ECC Section 503.2.7.1.3.
How EZTR1 Executes and Documents Testing
EZTR1’s certified progress inspectors coordinate duct leakage testing at the appropriate construction phase, witness the pressurization test, and verify that measured leakage rates fall within allowable limits per the approved energy compliance filing. All test results, sampled duct sections, and pass/fail determinations are documented in the TR-8 inspection report filed with the NYC Department of Buildings.
Ready to schedule your TR-8 duct leakage inspection? Contact EZTR1 to coordinate testing at the right construction phase.
-
TR-8 ENERGY INSPECTIONS
TR-8 Duct Plenum and Piping Insulation and Sealing
1RCNY IB5Installed duct and piping insulation shall be visually inspected to verify correct insulation placement and values. Ducts, air handlers, filter boxes…
Technical info
Full details ›1RCNY IB5
Installed duct and piping insulation shall be visually inspected to verify correct insulation placement and values.
Ducts, air handlers, filter boxes and building cavities used as ducts shall be visually inspected for proper sealing.1RCNY IIB5
Installed duct and piping insulation shall be visually inspected to verify proper insulation placement and values.
Joints, longitudinal and transverse seams and connections in ductwork shall be visually inspected for proper sealing.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Electric Vehicle Service Equipment Requirements(ID3)
Electric vehicle service equipment requirements ]Electric vehicle outlet or conduit and electrical service reserved space must be visually inspected to verify compliance.…
Technical info
Full details ›Electric vehicle service equipment requirements ]Electric vehicle outlet or conduit and electrical service reserved space must be visually inspected to verify compliance. Location [shall]must be noted on the permanent certificate. -
TR-8 ENERGY INSPECTIONS
TR-8 Electrical Energy Consumption (IC1), (IICC1
1RCNY IC1The presence and operation of individual meters or other means of monitoring individual dwelling units shall be verified by visual inspection…
Technical info
Full details ›1RCNY IC1
The presence and operation of individual meters or other means of monitoring individual dwelling units shall be verified by visual inspection for all dwelling units.1RCNY IIC1
The presence and operation of individual meters or other means of monitoring individual apartments shall be verified by visual inspection for all apartments.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Electrical Metering
1RCNY IC1The presence and operation of individual meters or other means of monitoring individual dwelling units shall be verified by visual inspection…
Technical info
Full details ›1RCNY IC1
The presence and operation of individual meters or other means of monitoring individual dwelling units shall be verified by visual inspection for all dwelling units.1RCNY IIC1
The presence and operation of individual meters or other means of monitoring individual apartments shall be verified by visual inspection for all apartments.Details
Individual Metering in NYC Buildings
Individual electrical metering is a foundational energy accountability measure under New York City’s Energy Conservation Code. By requiring that each dwelling unit or apartment have its own meter or equivalent monitoring device, the ECC ensures that occupants have direct visibility into their energy consumption — which consistently reduces usage compared to buildings where utility costs are bundled into rent.
Class 1 vs. Class 2 application:
- 1RCNY §IC1 (Class 1 — 1- and 2-family homes, townhouses): Each dwelling unit must have an individual meter or monitoring device that is present and operational at the time of the TR-8 progress inspection.
- 1RCNY §IIC1 (Class 2 — multifamily residential, 3 stories and above): Each individual apartment must be separately metered or monitored. This requirement aligns with NYC Local Law 132 (2016), which mandates sub-metering for certain large residential buildings, reinforcing the ECC’s unit-level monitoring requirement.
What EZTR1 Inspects
EZTR1’s certified progress inspectors verify the following during a TR-8 electrical metering inspection:
- Meter presence — individual meters are physically installed and assigned to each unit per the approved electrical drawings
- Operational status — meters are energized, reading correctly, and accessible for verification
- Monitoring alternatives — where smart meters or building energy management systems are used in lieu of individual meters, the inspector confirms the system meets the “other means of monitoring” standard per the approved energy compliance filing
All findings are documented in the TR-8 inspection report filed with the NYC Department of Buildings.
Ready to schedule your TR-8 electrical metering inspection? Contact EZTR1 to confirm compliance before your DOB sign-off.
-
TR-8 ENERGY INSPECTIONS
TR-8 Electrical Motors
1RCNY IIC8Where required by the construction documents for energy code compliance, motor listing or labels shall be visually inspected to verify that…
Technical info
Full details ›1RCNY IIC8
Where required by the construction documents for energy code compliance, motor listing or labels shall be visually inspected to verify that they comply with the respective energy requirements in the construction documents.Details
-
-
TR-8 ENERGY INSPECTIONS
TR-8 Exit Signs
1RCNY IIC6Installed exit signs shall be visually inspected to verify that the label indicates that they do not exceed maximum permitted wattage.…
Technical info
Full details ›1RCNY IIC6
Installed exit signs shall be visually inspected to verify that the label indicates that they do not exceed maximum permitted wattage.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Exterior Lighting Power
1RCNY IIC4Installed lighting shall be verified for compliance with source efficacy and/or the lighting power allowance by visual inspection of fixtures, lamps,…
Technical info
Full details ›1RCNY IIC4
Installed lighting shall be verified for compliance with source efficacy and/or the lighting power allowance by visual inspection of fixtures, lamps, ballasts and relevant transformers.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Fenestration Areas
1RCNY IA5Dimensions of windows, doors and skylights shall be verified by visual inspection. 1RCNY IIA5Dimensions of windows, doors and skylights shall be…
Technical info
Full details ›1RCNY IA5
Dimensions of windows, doors and skylights shall be verified by visual inspection.1RCNY IIA5
Dimensions of windows, doors and skylights shall be verified by visual inspection.What Is Fenestration Area Compliance in NYC Construction?
Fenestration area compliance is a required component of New York City’s Energy Conservation Code (ECC) inspection process, and it applies to most new residential and mixed-use construction projects in the five boroughs. Under 1RCNY §IA5 and §IIA5, the physical dimensions of all installed windows, exterior doors, and skylights must be measured and verified against the approved construction drawings during a TR-8 energy inspection.
This requirement exists because the total glazed area of a building — expressed as a percentage of the gross wall area — directly affects how much heat is gained or lost through the building envelope. Oversized fenestration increases thermal loads, while undersized openings may not meet ventilation or natural light minimums. Both conditions can result in a failed inspection and a DOB stop-work order.
Which buildings are affected? Fenestration area verification is required for:
- Class 1 buildings (1- and 2-family homes, townhouses) under 1RCNY IA5
- Class 2 buildings (multifamily residential, three stories and above) under 1RCNY IIA5
- New construction and gut-renovated buildings subject to full ECC compliance
How EZTR1 Conducts the Inspection Our certified special inspectors verify fenestration dimensions on-site using field measurements cross-referenced against the approved DOB construction drawings. We confirm that the rough opening sizes, installed frame dimensions, and total fenestration area ratios are consistent with the energy compliance documentation submitted to the DOB. All findings are documented in our TR-8 inspection report, which is filed directly with the Department of Buildings.
Ready to schedule your TR-8 fenestration area inspection? Contact EZTR1 today to confirm compliance before your next DOB inspection milestone.
Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Fenestration Door U-Factor and Product Rating(IA3)(IIA3)
1RCNY IA3U-factors of installed fenestration shall be verified by visual inspection for conformance with the U-factors identified in the construction drawings, either…
Technical info
Full details ›1RCNY IA3
U-factors of installed fenestration shall be verified by visual inspection for conformance with the U-factors identified in the construction drawings, either by verifying the manufacturer’s NFRC labels or, where not labeled, using the ratings in ECC Tables 303.1.3(1) and (2).1RCNY IIA3
U-factors and SHGC values of installed fenestration shall be visually inspected for conformance with the U-factors and SHGC values identified in the construction drawings by verifying the manufacturer’s NFRC labels or, where not labeled, using the ratings in ECC Tables 303.1.3(1), (2) and (3). Where ASHRAE 90.1 is used, visible light transmittance values shall also be verified.Details
What the NFRC Label Tells Your NYC Inspector
The NFRC (National Fenestration Rating Council) label is the primary product-level document your special inspector checks during a TR-8 fenestration inspection in New York City. Affixed directly to the window or door unit, the label certifies the product’s tested U-factor and Solar Heat Gain Coefficient (SHGC) as independently verified by an accredited simulation laboratory — not just claimed by the manufacturer.
What EZTR1 inspectors verify on the label:
- U-factor and SHGC values match the fenestration product schedule in the approved DOB construction drawings
- The NFRC certification mark is present and legible on the installed unit
- The product series or model number on the label corresponds to the specified product — substitutions require a revised DOB filing
The most common NYC DOB inspection finding: Labels removed by glaziers during installation, or products swapped in the field without updating the approved plans. In both cases, the inspector must reference ECC Tables 303.1.3(1) and (2) for Class 1 buildings, or Tables 303.1.3(1), (2), and (3) for Class 2 buildings, to establish a fallback rating for the unlabeled unit.
When a product cannot be rated through either the label or the ECC Tables, the installation fails the TR-8 inspection and a corrective action report is filed with the Department of Buildings.
Ready to confirm your windows and doors are code-compliant before your DOB inspection? Contact EZTR1 to schedule your TR-8 fenestration product rating inspection today.
-
TR-8 ENERGY INSPECTIONS
TR-8 Fenestration Ratings for Air Leakage
1RCNY IA4Windows, skylights and sliding glass doors, except site-built windows, skylights and doors, shall be visually inspected to verify that installed assemblies…
Technical info
Full details ›1RCNY IA4
Windows, skylights and sliding glass doors, except site-built windows, skylights and doors, shall be visually inspected to verify that installed assemblies are listed and labeled to the referenced standard.1RCNY IIA4
Windows and sliding or swinging door assemblies, except site-built windows and/or doors, shall be visually inspected to verify that installed assemblies are listed and labeled by the manufacturer to the referenced standard.
For curtain wall, storefront glazing, commercial entrance doors and revolving doors, the testing reports shall be reviewed to verify that the installed assembly complies with the standard cited in the approved plans.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Fenestration Thermal Values and Ratings
1RCNY IA3U-factors of installed fenestration shall be verified by visual inspection for conformance with the U-factors identified in the construction drawings, either…
Technical info
Full details ›1RCNY IA3
U-factors of installed fenestration shall be verified by visual inspection for conformance with the U-factors identified in the construction drawings, either by verifying the manufacturer’s NFRC labels or, where not labeled, using the ratings in ECC Tables 303.1.3(1) and (2).1RCNY IIA3
U-factors and SHGC values of installed fenestration shall be visually inspected for conformance with the U-factors and SHGC values identified in the construction drawings by verifying the manufacturer’s NFRC labels or, where not labeled, using the ratings in ECC Tables 303.1.3(1), (2) and (3). Where ASHRAE 90.1 is used, visible light transmittance values shall also be verified.
Details
Beyond the Label: Understanding Whole-Assembly The
While verifying NFRC labels confirms a product’s rated performance, the TR-8 inspection for fenestration thermal values goes further — it evaluates how the installed fenestration system performs as part of the complete building envelope assembly under NYC’s Energy Conservation Code (ECC).
The ECC Tables 303.1.3(1), (2), and (3) establish maximum allowable U-factors and minimum Solar Heat Gain Coefficient (SHGC) thresholds for the entire glazing system, not just individual products. This means the thermal performance of the frame, spacer, glazing layers, and installation method must collectively meet code — even if each individual component is rated correctly on its label.
Where this matters most in NYC construction:
- High-rise curtain wall systems — where the framing system’s thermal bridging can significantly degrade the assembly U-factor below what individual product ratings suggest
- Mixed-use buildings using ASHRAE 90.1 — which additionally requires verification of Visible Light Transmittance (VLT) values
- Gut-renovated brownstones — where new fenestration is installed in existing masonry openings, requiring field verification that thermal performance matches the energy compliance documents filed with the DOB
Relationship to blower door and air infiltration testing: A fenestration assembly that passes U-factor verification but fails air sealing can undermine the building’s overall thermal envelope performance. EZTR1 inspectors flag installation deficiencies — such as missing sill flashing, inadequate sealant at jambs, or thermal bridges at rough openings — that affect the assembly’s real-world thermal performance beyond what the label alone confirms.
Need a TR-8 thermal values inspection for your NYC project? Contact EZTR1 to schedule with a certified special inspector.
-
TR-8 ENERGY INSPECTIONS
TR-8 Fireplaces
1RCNY IB1Provision of combustion air and tight-fitting fireplace doors shall be verified by visual inspection. 1RCNY IIB1Provision of combustion air and tight-fitting…
Technical info
Full details ›1RCNY IB1
Provision of combustion air and tight-fitting fireplace doors shall be verified by visual inspection.1RCNY IIB1
Provision of combustion air and tight-fitting fireplace doors shall be verified by visual inspection.Details
TR-8 Fireplace Inspection
Fireplaces are one of the most significant sources of uncontrolled air infiltration in New York City buildings. When a fireplace damper is left open, missing, or improperly fitted, it functions as a direct opening in the building envelope — allowing heated or cooled interior air to escape and unconditioned outdoor air to enter freely. This is why the NYC Energy Conservation Code specifically requires fireplace compliance to be verified during a TR-8 progress inspection.
What the NYC Energy Code Requires
Under 1RCNY §IB1 (Class 1 — 1- and 2-family homes and townhouses) and 1RCNY §IIB1 (Class 2 — multifamily residential), two fireplace elements must be verified by visual inspection:
- Provision of combustion air — the fireplace must have a dedicated, code-compliant source of combustion air that does not draw from the conditioned living space, reducing the depressurization of the building interior during fireplace use
- Tight-fitting fireplace doors — glass or metal doors must be present, properly installed, and capable of closing fully against the firebox face to restrict air infiltration when the fireplace is not in use
What EZTR1 Inspects
EZTR1’s certified special inspectors verify both elements on-site against the approved DOB construction documents:
- Damper presence, condition, and operation (open/close mechanism intact)
- Tight-fitting door installation — no visible gaps at the frame or sweep
- Combustion air opening location, sizing, and compliance with the energy filing
All findings are documented in the TR-8 inspection report filed with the NYC Department of Buildings.
Ready to schedule your TR-8 fireplace inspection? Contact EZTR1 to confirm compliance before your DOB sign-off.
-
TR-8 ENERGY INSPECTIONS
TR-8 HVAC R and Service Water Heating System Control
1RCNY IB4System controls shall be inspected to verify that each dwelling is provided with at least one individual programmable thermostat with capabilities…
Technical info
Full details ›1RCNY IB4
System controls shall be inspected to verify that each dwelling is provided with at least one individual programmable thermostat with capabilities as described in ECC 403.1.1, and that such controls are set and operate as specified in ECC 403.1.1.
Controls for supplementary electric-resistance heat pumps shall be inspected to verify that such controls prevent supplemental heat operation when the heat pump compressor can meet the heating load.
Controls for snow- and ice-melting systems and pools shall be inspected for proper operation. Not less than 20% or one of each control type, whichever is more, shall be inspected.1RCNY IIB4
No less than 20% of each type of required controls and economizers shall be verified by visual inspection and tested for functionality and proper operation. Such controls shall include, but are not limited to:
• Thermostatic
• Set point overlap restriction
• Off-hour
• Shutoff damper
• Snow-melt system
• Demand control systems
• Outdoor heating systems
• Zones
• Economizers
• Air systems
• Variable air volume fan
• Hydronic systems
• Heat rejection equipment fan speed
• Complex mechanical systems serving multiple zones
• Ventilation
• Energy recovery systems
• Hot gas bypass limitation
• Temperature
• Service water heating
• Hot water system
• Pool heater and time switches
• Exhaust hoods
• Radiant heating systems.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 HVAC R and Service Water piping design &insulation
HVAC-R and service water piping design and insulation : Installed piping insulation must be visuall inspected to verify proper insulation placement and values.…
Technical info
Full details ›HVAC-R and service water piping design and insulation : Installed piping insulation must be visuall inspected to verify proper insulation placement and values. Service hot water distribution systems
must be inspected to verify the supply of heated water. HVAC and service water piping design and insulation : Installed piping insulation [shall]must be visually inspected to verify correct
insulation placement and values. [ Service hot water distribution systems must be inspected to verify the supply of heated water.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 HVAC-R and Service Water Heating Equipment
1RCNY IB3Heating and cooling equipment shall be verified by visual inspection for proper sizing. Pool heaters and covers shall be verified by…
Technical info
Full details ›1RCNY IB3
Heating and cooling equipment shall be verified by visual inspection for proper sizing. Pool heaters and covers shall be verified by visual inspection.1RCNY IIB3
Equipment sizing, efficiencies and other performance factors of all major equipment units, as determined by the applicant of record, and no less than 15% of minor equipment units, shall be verified by visual inspection and, where necessary, review of manufacturer’s data.
Pool heaters and covers shall be verified by visual inspection.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Insulation Placement and R Values
1RCNY IA2Installed insulation for each component of the conditioned space envelope and at junctions between components shall be visually inspected to ensure…
Technical info
Full details ›1RCNY IA2
Installed insulation for each component of the conditioned space envelope and at junctions between components shall be visually inspected to ensure that the R-values are marked, that such R-values conform to the R-values identified in the construction documents and that the insulation is properly installed. Certifications for unmarked insulation shall be similarly visually inspected.1RCNY IIA2
Installed insulation for each component of the conditioned space envelope and at junctions between components shall be visually inspected to ensure that the R-values are marked, that such R-values conform to the R-values identified in the construction documents and that the insulation is properly installed. Certifications for unmarked insulation shall be similarly visually inspected.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Interior Lighting Power
1RCNY IIC3Installed lighting shall be verified for compliance with the lighting power allowance by visual inspection of fixtures, lamps, ballasts and transformers.…
Technical info
Full details ›1RCNY IIC3
Installed lighting shall be verified for compliance with the lighting power allowance by visual inspection of fixtures, lamps, ballasts and transformers.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Lighting Controls
1RCNY IIC5Each type of required lighting controls, including: • occupant sensors • manual interior lighting controls • light-reduction controls • automatic lighting…
Technical info
Full details ›1RCNY IIC5
Each type of required lighting controls, including:
• occupant sensors
• manual interior lighting controls
• light-reduction controls
• automatic lighting shut-off
• daylight zone controls
• sleeping unit controls
• exterior lighting controls
shall be verified by visual inspection and tested for functionality and proper operation.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Lighting in Dwelling Units
1RCNY IC2Lamps in permanently installed lighting fixtures shall be visually inspected to verify compliance with high-efficacy requirements. 1RCNY IIC2Lamps in permanently installed…
Technical info
Full details ›1RCNY IC2
Lamps in permanently installed lighting fixtures shall be visually inspected to verify compliance with high-efficacy requirements.1RCNY IIC2
Lamps in permanently installed lighting fixtures shall be visually inspected to verify compliance with high-efficacy requirements.Details
What NYC Inspectors Actually Check
Under New York City’s Energy Conservation Code, “high-efficacy” refers to lamps that meet a minimum luminous efficacy threshold — measured in lumens per watt — as defined in ECC Section 404. In practice, this means LED lamps and fixtures, or compact fluorescent lamps (CFLs) that meet the threshold. Incandescent and halogen lamps in permanently installed fixtures do not qualify and will result in a failed TR-8 inspection.
Class 1 vs. Class 2 scope:
- 1RCNY §IC2 (Class 1 — 1- and 2-family homes, townhouses): All permanently installed lighting fixtures in the dwelling unit must use high-efficacy lamps. This includes recessed cans, ceiling mounts, under-cabinet lighting, and bathroom vanity fixtures.
- 1RCNY §IIC2 (Class 2 — multifamily residential, 3 stories and above): The same high-efficacy requirement applies to permanently installed fixtures in each individual dwelling unit. Common area and corridor lighting is addressed separately under other code sections.
Common NYC DOB inspection failures:
- Non-compliant lamps installed by an electrician or contractor after the approved fixtures were set
- Recessed downlights fitted with incandescent retrofit bulbs instead of LED modules
- Fixtures missing manufacturer labels confirming high-efficacy compliance
How EZTR1 Inspects
EZTR1’s certified special inspectors perform a visual inspection of all permanently installed lighting fixtures, confirming lamp type and efficacy compliance against the approved construction documents. Findings are documented in the TR-8 inspection report filed with the NYC DOB.
Ready to schedule your TR-8 lighting inspection? Contact EZTR1 before your final DOB sign-off.
-
TR-8 ENERGY INSPECTIONS
TR-8 Loading Deck Weather Seals
1RCNY IIA8Weatherseals at loading docks shall be visually verified.
Technical info
Full details ›1RCNY IIA8
Weatherseals at loading docks shall be visually verified.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Maintenance Information
1RCNY ID1Maintenance manuals for equipment and systems requiring preventive maintenance shall be reviewed for applicability to installed equipment and systems before such…
Technical info
Full details ›1RCNY ID1
Maintenance manuals for equipment and systems requiring preventive maintenance shall be reviewed for applicability to installed equipment and systems before such manuals are provided to the owner.
Labels required for such equipment or systems shall be inspected for accuracy and completeness.1RCNY IID1
Maintenance manuals for mechanical, service hot water and electrical equipment and systems requiring preventive maintenance shall be reviewed for applicability to installed equipment and systems before such manuals are provided to the owner. Labels required for such equipment or systems shall be inspected for accuracy and completeness.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Permanent Certificate
1RCNY ID2The installed permanent certificate shall be visually inspected for location, completeness and accuracy.
Technical info
Full details ›1RCNY ID2
The installed permanent certificate shall be visually inspected for location, completeness and accuracy.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Projection Factors
1RCNY IIA7Where the energy analysis utilized a projection factor > 0, the projection dimensions of overhangs, eaves or permanently attached shading devices…
Technical info
Full details ›1RCNY IIA7
Where the energy analysis utilized a projection factor > 0, the projection dimensions of overhangs, eaves or permanently attached shading devices shall be verified for conformance with approved plans by visual inspection.Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Protection of Foundation Insulation
1RCNY IA1Insulation shall be visually inspected to verify proper protection where applied to the exterior of basement or cellar walls, crawl-space walls…
Technical info
Full details ›1RCNY IA1
Insulation shall be visually inspected to verify proper protection where applied to the exterior of basement or cellar walls, crawl-space walls and/or the perimeter of slab-on-grade floors.1RCNY IIA1
Insulation shall be visually inspected to verify proper protection where applied to the exterior of basement or cellar walls, crawl-space walls and/or the perimeter of slab-on-grade floors.Details
Why Foundation Insulation Needs Protection
Exterior foundation insulation is one of the most effective tools for reducing heat loss through a building’s below-grade envelope, but the insulation itself is vulnerable to UV degradation, physical damage from backfill and landscaping, and moisture infiltration if left exposed. NYC’s Energy Conservation Code requires that any insulation applied to the exterior of basement or cellar walls, crawl-space walls, or the perimeter of slab-on-grade floors must be physically protected — and that protection must be verified by visual inspection during the TR-8 progress inspection.
What “proper protection” means in practice:
Accepted protection methods in NYC construction include:
- Cementitious stucco or parging applied over foam board above grade
- Rigid cement board or cementboard panels for above-grade exposed sections
- HDPE drainage board or dimple mat used in below-grade applications
- Aluminum or galvanized metal flashing at the insulation termination point
Common insulation types requiring protection include extruded polystyrene (XPS) and expanded polystyrene (EPS) rigid foam boards, both of which degrade rapidly when exposed to sunlight or physical impact without a protective covering.
Class 1 vs. Class 2 application: Both 1RCNY §IA1 (Class 1 — 1- and 2-family homes) and §IIA1 (Class 2 — multifamily residential) require the same visual inspection. The requirement applies equally to new construction and to gut-renovated buildings where the foundation assembly has been altered.
Ready to schedule your TR-8 foundation insulation inspection? Contact EZTR1 to confirm compliance before your next DOB inspection milestone.
-
TR-8 ENERGY INSPECTIONS
TR-8 Solar Ready Requirements (ID3)
Technical info
Full details ›Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.
-
TR-8 ENERGY INSPECTIONS
TR-8 Tandem Wiring
1RCNY IIC7Tandem wiring shall be tested for functionality.
-
TR-8 ENERGY INSPECTIONS
TR-8 Ventilation and Air Distribution System(IB2)
Ventilation and air distribution system: Ventilation system must be verified to comply with the ERV/HRV requirements or balanced ventilation system. Whole-house ventilation fan…
Technical info
Full details ›Ventilation and air distribution system: Ventilation system must be verified to comply with the ERV/HRV requirements or balanced ventilation system. Whole-house ventilation fan efficacy must be verified by visual inspection. Not less than 20% of installed automatic or gravity dampers, and a minimum of one of each type, must be visually inspected and physically tested for proper operation. Details
-
TR-8 ENERGY INSPECTIONS
TR-8 Vestibules
1RCNY IIA9Required entrance vestibules shall be visually inspected for proper operation. TR-8 Vestibule Inspection A vestibule is […]
Technical info
Full details ›1RCNY IIA9
Required entrance vestibules shall be visually inspected for proper operation.Details
TR-8 Vestibule Inspection
A vestibule is an enclosed entry buffer zone — typically a small anteroom or airlock between an exterior door and the interior of a building — designed to prevent conditioned air from escaping every time the building entrance is used. Under New York City’s Energy Conservation Code, vestibules are a mandatory energy conservation measure for certain building types, and their proper installation and operation must be verified during a TR-8 progress inspection.
What the NYC Energy Code Requires
Under 1RCNY §IA2 (Class 1 buildings — 1- and 2-family homes and townhouses) and 1RCNY §IIA2 (Class 2 buildings — multifamily residential three stories and above), vestibules must be visually inspected for proper operation. This means the inspector confirms that the vestibule functions as intended: both doors do not open simultaneously, the space is fully enclosed, and conditioned air cannot bypass directly from interior to exterior in a single door-open event.
Which Buildings Are Affected
Vestibule requirements typically apply to:
- New multifamily residential buildings with heated lobby entries
- Mixed-use buildings with ground-floor commercial space
- High-occupancy buildings where frequent entry and exit creates significant infiltration load
What EZTR1 Inspects
EZTR1’s certified special inspectors verify the following during a TR-8 vestibule inspection:
- Door gap and self-closing mechanisms — both inner and outer doors must self-close and latch properly, with no excessive gaps at the door sweep, jamb, or threshold
- Air lock integrity — the vestibule must be fully enclosed on all sides, with no open passages that bypass the airlock function
- Heating provisions — where required by the approved construction documents, the inspector confirms that heating elements within the vestibule are present and operational per the energy compliance filing
All findings are documented in the TR-8 inspection report and filed directly with the NYC Department of Buildings.
Ready to schedule your TR-8 vestibule inspection? Contact EZTR1 to confirm your building’s energy compliance before your next DOB milestone.