Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.
Related products
-
TR-8 ENERGY INSPECTIONS
TR-8 Fenestration Door U-Factor and Product Rating(IA3)(IIA3)
1RCNY IA3U-factors of installed fenestration shall be verified by visual inspection for conformance with the U-factors identified in the construction drawings, either…
-
TR-8 ENERGY INSPECTIONS
TR-8 Fenestration Ratings for Air Leakage
1RCNY IA4Windows, skylights and sliding glass doors, except site-built windows, skylights and doors, shall be visually inspected to verify that installed assemblies…
-
TR-8 ENERGY INSPECTIONS
TR-8 Shutoff Dampers (IB2), (IIB2)
1RCNY IB2Not less than 20% of installed automatic or gravity dampers, and a minimum of one of each type, shall be visually…
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Sealing and Insulation – Testing
1RCNY IA7Testing shall be performed in accordance with section ECC 402.4.2.1 and shall be accepted if the building meets the requirements detailed…
