Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.
Related products
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Barrier – Testing(IA7,IIA7)
Air barrier – testing: Testing must be performed in accordance with section ECC 402.4.1.2 or R402.4.1.3 and shall be accepted if the building…
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Barrier Continuity Plan Testing/ Inspection(IIA8)
Air barrier continuity plan testing: Each unique air barrier joint or seam must be tested or inspected for compliance. Documentation includes the…
-
TR-8 ENERGY INSPECTIONS
TR-8 Projection Factors
1RCNY IIA7Where the energy analysis utilized a projection factor > 0, the projection dimensions of overhangs, eaves or permanently attached shading devices…
-
TR-8 ENERGY INSPECTIONS
TR-8 Electric Vehicle Service Equipment Requirements(ID3)
Electric vehicle service equipment requirements ]Electric vehicle outlet or conduit and electrical service reserved space must be visually inspected to verify compliance.…
