TR-8 Ventilation and Air Distribution System(IB2)

$500.00

Calculated total $500.00

SKU: EZTR1-P0025 Category:
Ventilation and air distribution system: Ventilation system must be verified to comply with the ERV/HRV requirements or balanced ventilation system. Whole-house ventilation fan efficacy must be verified by visual inspection. Not less than 20% of installed automatic or gravity dampers, and a minimum of one of each type, must be visually inspected and physically tested for proper operation. 

Details

Project Too Big Or Complex For Menu Pricing? Contact Us For A Detailed Project Specific Proposal.

Not every project fits our online catalog. Share your project details, and our team will review your requirements, recommend the right inspection services, and provide a custom quote.

Request a Custom Quote