TR-8 ENERGY INSPECTIONS
TR-8 Insulation Placement and R Values
1RCNY IA2Installed insulation for each component of the conditioned space envelope and at junctions between components shall be visually inspected to ensure…
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Barrier-Visual Inspection(IA6,IIA6)
Air barrier – visual inspection: Openings and penetrations in the building envelope, including site-built fenestration and doors, must be visually inspected to verify that…
-
TR-8 ENERGY INSPECTIONS
TR-8 Fenestration Door U-Factor and Product Rating(IA3)(IIA3)
1RCNY IA3U-factors of installed fenestration shall be verified by visual inspection for conformance with the U-factors identified in the construction drawings, either…
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Sealing and Insulation Testing/ Blower Door Test Report
Testing shall be performed in accordance with section ECC 402.4.2.1 and shall be accepted if the building meets the requirements detailed in…