2023 Special Inspections in NYC

  • Special Inspections

    Adhesive-Based Solar Pedestal Bonding Systems

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.1.1 (2022); BB #2025-010

    Work type(s): SL

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • Special Inspections

    Alternative Materials – OTCR Buildings Bulletin

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1704.14 (2014); BC 1705.1.1 (2022)

    Work type(s): PL, SP, SD, AN, SF, SG, GC, MS, BE, ST, FO, EA, SOE, PMM, SC, FN, SH, SF

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • Special Inspections

    Combustible Exterior Wall Coverings

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.16 (2022)

    Work type(s): GC, FO

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • Special Inspections

    Construction Operations Influencing Adjacent Structures

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $3,000.00

  • Special Inspections

    Construction Utilizing CLT or SCL Type IV

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • Special Inspections

    CPVC for water recycling distribution piping systems

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.1.1 (2022); BB #2011-021

    Work type(s): PL, SC

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • Special Inspections

    Designated Seismic System

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • Special Inspections

    Exhaust and Vent Systems in Plenums and Ducts

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • Special Inspections

    Fuel-Oil Storage and Fuel-Oil Piping Systems

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1704.17 (2014); BC 1705.22 (2022)

    Work type(s): PL, AN, BE*

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • Special Inspections

    Non Potable Water Systems

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • Special Inspections

    Open-Web Steel Joists and Joist Girders

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • Special Inspections

    Polypropylene (“PP”) Piping Systems

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.1.1 (2022); BB #2015-020

    Work type(s): PL, SC

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • Special Inspections

    Post-installed Anchors in Masonry

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.1.1 (2022); BB #2016-005

    Work type(s): ST, SC

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • Special Inspections

    Prefabricated Parallel Chord Wood Trusses

    Project-specific review and pricing required.

    Technical info

    Code section: BC 1705.1.1 (2022); BB #2012-004

    Work type(s): ST, SC

    Project-specific review and pricing are required for this inspection.

    Full details ›
    Project-specific pricing requiredRequest a Quote
  • Special Inspections

    Prestressed Rock and Soil Anchors

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • Special Inspections

    Seismic Resistance of Access Floors

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • Special Inspections

    Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • Special Inspections

    Seismic Resistance of Storage Racks

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

  • Special Inspections

    Tenant Protection Plan Weekly Inspection Compliance

    TPP WEEKLY INSPECTION PRICE IS PER INSPECTION. A WEEKLY INSPECTION IS REQUIRED.   (As per 2022 NYCBC, Inspection is required 72 hours…

    Technical info

    TPP WEEKLY INSPECTION

    PRICE IS PER INSPECTION. A WEEKLY INSPECTION IS REQUIRED.

     

    (As per 2022 NYCBC, Inspection is required 72 hours prior to construction start date, plus once weekly during the entire construction period), THE OWNER IS RESPONSIBLE TO AUTHORIZE AND PAY FOR, MINIMUM 48 HOUR PRIOR TO SCHEDULING, ALL INSPECTIONS DURING THE ENTIRE CONSTRUCTION PERIOD. AKS WILL NOT ATTEND WEEKLY INSPECTION WITHOUT PRIOR PAYMENT AND IS NOT RESPONSIBLE FOR DOB VIOLATIONS ISSUED DUE TO LAPSE IN INSPECTION DUE TO NON-PAYMENT. ADDITIONAL WEEKLY INSPECTIONS CAN BE ALWAYS BE SCHEDULED ON LINE AT www.EZTR1.com

    A Tenant Protection Plan (TPP) outlines what steps the contractor and owner will take to protect tenants living in buildings under construction/renovation to avoid or limit service disruptions and mitigate the negative impacts of construction.  

    Prior to obtaining a construction permit, a Registered Design Professional must submit a TPP if there is at least one occupied dwelling unit. Each construction permit requires its own TPP that outlines tenant protections specific to that scope of work. The elements of the TPP may vary depending on the nature and scope of the work, but at a minimum shall make detailed and specific provisions for:

    • Egress. Clarify how adequate egress will be maintained during construction.
    • Fire Safety. Identify safety measures to maintain fire safety during construction.
    • Health Requirements. Specify methods to be used for dust control, disposal of construction debris, pest control and maintenance of sanitary facilities. Owners must include a statement certifying compliance with applicable laws and filings relating to lead and asbestos.
    • Compliance with Housing Standards. Demonstrate compliance with  the New York City Housing Maintenance Code, and New York State Multiple Dwelling Law shall be strictly observed.
    • Structural Safety. Identify specific measures to maintain  structural stability during construction.
    • Noise Restrictions. Identify the specific means and methods used to limit noise to acceptable levels in accordance with the NYC Noise Control Code. 
    • Maintaining Essential Services. Describe specific means and methods to be used to maintain heat, hot water, cold water, gas, electricity, or other utility services, in accordance with the NYC Housing Maintenance Code.  Specify if a disruption of any such service is anticipated during the work, the expected duration of such disruption, the means and methods that will be taken to minimize such disruption, including the provision of sufficient  alternatives for such service during the disruption. Notification of the disruption must be given to all affected occupants of occupied dwelling units.

     

    1705.26.1 Inspection frequency.

    Special inspections shall be performed throughout the duration of the tenant protection plan at sufficient periodic intervals to verify compliance with the tenant protection plan throughout the course of work. At a minimum, inspections shall be performed:

       1.   Prior to the start of construction and/or demolition to document conditions prior to work;

       2.   At the start of construction and/or demolition;

       3.   Once per week during construction and/or demolition;

       4.   After a tenant protection plan violation has been issued to verify that the violation was corrected;

       5.   When the location of the alteration or construction operations performed in conjunction with the tenant protection plan has moved to another location; and

       6.   Whenever construction or demolition operations have changed, requiring changes in methods of protection.

     

    1705.26.2 Reporting.

    A written record of the special inspections performed for the tenant protection plan shall be maintained in a log prepared by the special inspector. The log shall include an entry for each inspection and shall indicate that the alteration or construction operation is being performed in accordance with the tenant protection plan. Copies of the special inspection log book shall be maintained at the job site, and at the office of the special inspector, and shall be available for use and review at all reasonable times, until the work subject to special inspection is complete.

    Full details ›
    Calculated total $750.00

  • Special Inspections

    Wood Seismic Resistance

    Technical info

    Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.

    Full details ›
    Calculated total $1,000.00

Project Too Big Or Complex For Menu Pricing? Contact Us For A Detailed Project Specific Proposal.

Not every project fits our online catalog. Share your project details, and our team will review your requirements, recommend the right inspection services, and provide a custom quote.

Request a Custom Quote