TR-1 Septic System Installation

$1,000.00

Calculated total $1,000.00

SKU: EZTR1-P0104 Category:

1704.20 Site storm drainage disposal and detention facilities. Storm water detention facilities, roof retention facilities and dry-well systems shall be inspected for conformance with the approved construction documents. Minor variations, based on actual site conditions, shall be acceptable at the discretion of the registered design professional of record. Verification shall include:

1. Materials of construction.
2. Bedding of pipe and facilities.
3. Placement and installation of fill materials.
4. Volume of drywell and detention facilities.
5. Installation of volume flow control devices.
6. Workmanship and quality of installation.
7. Overall conformance with the approved construction documents. Hydrostatic testing of the detention system shall be required when the system is designed as watertight.

Details

Project Too Big Or Complex For Menu Pricing? Contact Us For A Detailed Project Specific Proposal.

Not every project fits our online catalog. Share your project details, and our team will review your requirements, recommend the right inspection services, and provide a custom quote.

Request a Custom Quote