1704.19 High-pressure-gas piping.High-pressure-gas pipingregulated in Section 406 of the New York City FuelGas Codeshall be subject to special inspection in accordance with this section.Special inspection of seismic bracing shall be performed in accordance with Section 1707.7
TR-1 High Temperature Fuel Gas Piping (Welding) (BC 1704.19)
$800.00
SKU: EZTR1-P0001
Category: TR-1 SPECIAL INSPECTIONS
Related products
-
TR-1 SPECIAL INSPECTIONS
TR-1 Masonry (BC 1704.5)
1704.5 Masonry construction. Masonry construction shall be inspected and evaluated in accordance with the requirements of this section, depending on the structural…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Public Assembly Emergency Lighting
Public Assembly Emergency Lighting (28-116.2.2)Compliance inspections. In addition to the inspections specified in this code, the commissioner is authorized to make or…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Emergency Power Systems (Generators)
1704.13 Special case. Special inspections shall be required for proposed work that is, in the opinion of the commissioner, unusual in its…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Flood Zone Compliance (BC G105)
109.3.2 lowest floor elevation. In areas of special flood hazzard, upon placement of the lowest floor, including the basement (for flood zone…
