1RCNY IIC7
Tandem wiring shall be tested for functionality.
Related products
-
TR-8 ENERGY INSPECTIONS
TR-8 Fenestration Door U-Factor and Product Rating(IA3)(IIA3)
1RCNY IA3U-factors of installed fenestration shall be verified by visual inspection for conformance with the U-factors identified in the construction drawings, either…
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Sealing and Insulation – Visual
1RCNY IA6Openings and penetrations in the building envelope, including site-built fenestration and doors, shall be visually inspected to verify that they are…
-
TR-8 ENERGY INSPECTIONS
TR-8 Solar Ready Requirements (ID3)
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Sealing and Insulation Testing/ Blower Door Test Report
Testing shall be performed in accordance with section ECC 402.4.2.1 and shall be accepted if the building meets the requirements detailed in…
