109.3.1 Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94, the concrete need not be on the job.
Related products
-
TR-1 SPECIAL INSPECTIONS
TR-1 Flood Zone Compliance (BC G105)
109.3.2 lowest floor elevation. In areas of special flood hazzard, upon placement of the lowest floor, including the basement (for flood zone…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Final Inspection 28-116.2.4.2 BC-109.5 Dir-14
Call for job specific quote. 109.5 Final inspection. Refer to Chapter 1 of Title 28 of the Administrative Code. Directive…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Lowest Floor Elevation FEMA (BC 109.3.2)
109.3.2 Lowest floor elevation. In areas of special flood hazard, upon placement of the lowest floor, including the basement (for flood zone…
-
TR-1 SPECIAL INSPECTIONS
TR-1 High Temperature Fuel Gas Piping (Welding) (BC 1704.19)
1704.19 High-pressure-gas piping.High-pressure-gas pipingregulated in Section 406 of the New York City FuelGas Codeshall be subject to special inspection in accordance with…