1RCNY IIC7
Tandem wiring shall be tested for functionality.
Related products
-
TR-8 ENERGY INSPECTIONS
TR-8 Solar Ready Requirements (ID3)
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Sealing and Insulation – Testing
1RCNY IA7Testing shall be performed in accordance with section ECC 402.4.2.1 and shall be accepted if the building meets the requirements detailed…
-
TR-8 ENERGY INSPECTIONS
EN-2 Energy Code Analysis (BC 109.3.5)
NYC Energy Code Analysis as required by NYCDOB, limited to small projects, 4000sf or less. Energy code compliance Analysis shall be made to…
-
TR-8 ENERGY INSPECTIONS
TR-8 Air Barrier Continuity Plan Testing/ Inspection(IIA8)
Air barrier continuity plan testing: Each unique air barrier joint or seam must be tested or inspected for compliance. Documentation includes the…
