1704.21.1.2 Soil percolation tests.Prior to the approval of construction documents, soil percolation tests shall be performed in accordance with the provisions of Section 1114.2.2 of the New York City Plumbing Code at the site of a proposed on-site stormwater drainage and detention facility installation to determine the suitability of the soil and site. Such test shall beperformed under the supervision of a special inspector. The results of the percolation tests shall be filed on forms provided by the department, stating the suitability of the site and the capacity of the subsoil for the proposed use. The registered design professional of record for the dry-well system shall benotified immediately if the results of the percolation test demonstrate that the system may not function as designed
TR-1 Private On-site Storm Water Drainage Disposal Systems and Detention Facilit
$1,000.00
SKU: EZTR1-P0002
Category: TR-1 SPECIAL INSPECTIONS
Related products
-
TR-1 SPECIAL INSPECTIONS
TR-1 Vertical Masonry Foundation Elements (BC 1704.9)
TR-1 Vertical Masonry Foundation Elements Vertical masonry foundation elements are a required special inspection category under […]
-
TR-1 SPECIAL INSPECTIONS
TR-1 Final Inspection 28-116.2.4.2 BC-109.5 Dir-14
Call for job specific quote. 109.5 Final inspection. Refer to Chapter 1 of Title 28 of the Administrative Code. Directive…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Flood Zone Compliance (BC G105)
109.3.2 lowest floor elevation. In areas of special flood hazzard, upon placement of the lowest floor, including the basement (for flood zone…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Preliminary (28-116.2.1, BC 109.2)
109.2 Preliminary inspection. Refer to Chapter 1 of Title 28 of the Administrative Code.
