Technical details for this inspection are being reviewed. Contact AKS to confirm the inspection requirements for your project. Contact AKS.
Related products
-
TR-1 SPECIAL INSPECTIONS
TR-1 Footing Foundation (BC 109.3.1)
109.3.1 Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing…
-
TR-1 SPECIAL INSPECTIONS
TR-1 High-Pressure Fuel-Gas Piping (Welding) (BC 1704.19)
1704.19 High-pressure-gas piping.High-pressure-gas pipingregulated in Section 406 of the New York City FuelGas Codeshall be subject to special inspection in accordance with…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Emergency Power Systems (Generators)
Plan your TR-1 emergency power inspection Arrange a TR-1 inspection for emergency power systems and generators in New York City. Use this…
-
TR-1 SPECIAL INSPECTIONS
TR-1 Construction Utilizing CLT or SCL Type IV
